Darlington Road, Skeeby is operational in North Yorkshire with a recorded capacity of 55 MW, and has been generating since 2024-10-24.

55 MW
Capacity
as recorded in REPD
Operational
Status
since 2024-10-24
Solar Photovoltaics
Technology
Atrato Onsite Energy / Harmony Energy
North Yorkshire
Authority
England

Planning and build timeline

Application submitted2021-10-18
Permission granted2022-11-15
13 months after submission
Operational2024-10-24
23 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

North Yorkshire’s record on solar

North Yorkshire has decided 105 solar farms and approved 96%, taking a median of 2.7 months. See every solar farm decision in North Yorkshire

Other built sites within 15 km

SiteMWDistance
Land at Stripe Farm
Solar Photovoltaics · Operational
50.7 km
Darlington Road, Skeeby - Battery Energy Storage
Battery · Under Construction
350.8 km
Scorton
Landfill Gas · Operational
16 km
Land East of Appleton Farm
Solar Photovoltaics · Operational
57.2 km
Vale Of Mowbray Limited - Solar Photovoltaic System
Solar Photovoltaics · Under Construction
114.8 km

How big is Darlington Road, Skeeby?

Darlington Road, Skeeby has a recorded installed capacity of 55 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Darlington Road, Skeeby?

REPD records the operator as Atrato Onsite Energy / Harmony Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Darlington Road, Skeeby approved and built?

The application was submitted on 2021-10-18. Permission was granted on 2022-11-15, 13 months later. The site became operational on 2024-10-24, 23 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 8131.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council