Renewable sites › North East of Ainderby Steeple
North East of Ainderby Steeple
North East of Ainderby Steeple is an operational 5.9 MW solar farm in North Yorkshire, generating since 24 March 2017. Planning permission was granted on 24 December 2014, 10 months after submission. Operator of record: Renesola UK.
Planning and build timeline
| Application submitted | 5 March 2014 |
| Permission granted | 24 December 2014 10 months after submission |
| Operational | 24 March 2017 27 months after consent |
Screening a site of your own?
North Yorkshire approves 96% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with North East of Ainderby Steeple’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
- Conservation area — Ainderby Steeple
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
North Yorkshire’s record on solar
North Yorkshire has decided 105 solar farms and approved 96%, taking a median of 2.7 months. See every solar farm decision in North Yorkshire →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Anaerobic Digestion · Operational | 1.5 | 5.1 km |
Solar Photovoltaics · Under Construction | 1 | 5.1 km |
Solar Photovoltaics · Operational | 5 | 10.4 km |
Solar Photovoltaics · Operational | 5 | 11.3 km |
Solar Photovoltaics · Operational | 0.24 | 11.4 km |
Landfill Gas · Operational | 1 | 11.5 km |
How big is North East of Ainderby Steeple?
North East of Ainderby Steeple has a recorded installed capacity of 5.9 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates North East of Ainderby Steeple?
REPD records the operator as Renesola UK. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was North East of Ainderby Steeple approved and built?
The application was submitted on 5 March 2014. Permission was granted on 24 December 2014, 10 months later. The site became operational on 24 March 2017, 27 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1927.