Novarly ParcelRenewable sites

Renewable sitesNorth East of Ainderby Steeple

North East of Ainderby Steeple

North East of Ainderby Steeple is operational in North Yorkshire with a recorded capacity of 5.9 MW, and has been generating since 2017-03-24.

5.9 MW
Capacity
as recorded in REPD
Operational
Status
since 2017-03-24
Solar Photovoltaics
Technology
Renesola UK
North Yorkshire
Authority
England

Planning and build timeline

Application submitted2014-03-05
Permission granted2014-12-24
10 months after submission
Operational2017-03-24
27 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

North Yorkshire’s record on solar

North Yorkshire has decided 105 solar farms and approved 96%, taking a median of 2.7 months. See every solar farm decision in North Yorkshire

Other built sites within 15 km

SiteMWDistance
Leeming Bar (Waste AD)
Anaerobic Digestion · Operational
1.55.1 km
Vale Of Mowbray Limited - Solar Photovoltaic System
Solar Photovoltaics · Under Construction
15.1 km
Land East of Appleton Farm
Solar Photovoltaics · Operational
510.4 km
Land North of Sandhutton Lane
Solar Photovoltaics · Operational
511.3 km
Heck Food, Lime Lane - Solar Panels
Solar Photovoltaics · Operational
0.2411.4 km
Scorton
Landfill Gas · Operational
111.5 km

How big is North East of Ainderby Steeple?

North East of Ainderby Steeple has a recorded installed capacity of 5.9 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates North East of Ainderby Steeple?

REPD records the operator as Renesola UK. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was North East of Ainderby Steeple approved and built?

The application was submitted on 2014-03-05. Permission was granted on 2014-12-24, 10 months later. The site became operational on 2017-03-24, 27 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1927.

Novarly Parcel · official public data, read properly · parcel.novarly.com