North East of Ainderby Steeple is operational in North Yorkshire with a recorded capacity of 5.9 MW, and has been generating since 2017-03-24.
Planning and build timeline
| Application submitted | 2014-03-05 |
| Permission granted | 2014-12-24 10 months after submission |
| Operational | 2017-03-24 27 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
- Conservation area — Ainderby Steeple
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
North Yorkshire’s record on solar
North Yorkshire has decided 105 solar farms and approved 96%, taking a median of 2.7 months. See every solar farm decision in North Yorkshire →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Leeming Bar (Waste AD) Anaerobic Digestion · Operational | 1.5 | 5.1 km |
Vale Of Mowbray Limited - Solar Photovoltaic System Solar Photovoltaics · Under Construction | 1 | 5.1 km |
Land East of Appleton Farm Solar Photovoltaics · Operational | 5 | 10.4 km |
Land North of Sandhutton Lane Solar Photovoltaics · Operational | 5 | 11.3 km |
Heck Food, Lime Lane - Solar Panels Solar Photovoltaics · Operational | 0.24 | 11.4 km |
Scorton Landfill Gas · Operational | 1 | 11.5 km |
How big is North East of Ainderby Steeple?
North East of Ainderby Steeple has a recorded installed capacity of 5.9 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates North East of Ainderby Steeple?
REPD records the operator as Renesola UK. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was North East of Ainderby Steeple approved and built?
The application was submitted on 2014-03-05. Permission was granted on 2014-12-24, 10 months later. The site became operational on 2017-03-24, 27 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1927.