Land East of Appleton Farm
Land East of Appleton Farm is an operational 5 MW solar farm in North Yorkshire, generating since 27 March 2016. Planning permission was granted on 14 September 2015, 3 months after submission. Operator of record: Gresham House.
Planning and build timeline
| Application submitted | 16 June 2015 |
| Permission granted | 14 September 2015 3 months after submission |
| Operational | 27 March 2016 6 months after consent |
Screening a site of your own?
North Yorkshire approves 96% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Land East of Appleton Farm’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
North Yorkshire’s record on solar
North Yorkshire has decided 105 solar farms and approved 96%, taking a median of 2.7 months. See every solar farm decision in North Yorkshire →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Landfill Gas · Operational | 1 | 5.1 km |
Solar Photovoltaics · Operational | 55 | 7.2 km |
Solar Photovoltaics · Under Construction | 1 | 7.6 km |
Battery · Under Construction | 35 | 7.7 km |
Solar Photovoltaics · Operational | 5 | 7.8 km |
Anaerobic Digestion · Operational | 1.5 | 9.6 km |
Solar Photovoltaics · Operational | 5.9 | 10.4 km |
How big is Land East of Appleton Farm?
Land East of Appleton Farm has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Land East of Appleton Farm?
REPD records the operator as Gresham House. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Land East of Appleton Farm approved and built?
The application was submitted on 16 June 2015. Permission was granted on 14 September 2015, 3 months later. The site became operational on 27 March 2016, 6 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5400.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode