Hill of Fiddes is an operational 6.9 MW onshore wind farm in Aberdeenshire, generating since 20 February 2010. Planning permission was granted on 1 April 2008, 7 months after submission. Operator of record: Infinis, previously Broadview Energy.

6.9 MW
Capacity
as recorded in REPD
Operational
Status
since 20 February 2010
Wind Onshore
Technology
Infinis, previously Broadview Energy
Aberdeenshire
Authority
Scotland

Planning and build timeline

Application submitted3 September 2007
Permission granted1 April 2008
7 months after submission
Operational20 February 2010
23 months after consent

Screening a site of your own?

RedlineUK · £39

Aberdeenshire approves 69% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Hill of Fiddes’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Aberdeenshire’s record on onshore wind

Aberdeenshire has decided 118 onshore wind schemes and approved 69%, taking a median of 12.7 months. See every onshore wind scheme decision in Aberdeenshire

Other built sites within 15 km

SiteMWDistance
Battery · Under Construction
2.8 km
Solar Photovoltaics · Under Construction
212.8 km
Anaerobic Digestion · Under Construction
3.57.6 km
Landfill Gas · Operational
2.210.5 km
Wind Onshore · Operational
2.411 km
Landfill Gas · Operational
2.211.2 km
Wind Onshore · Operational
2.312.8 km
Battery · Under Construction
3013 km

How big is Hill of Fiddes?

Hill of Fiddes has a recorded installed capacity of 6.9 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Hill of Fiddes?

REPD records the operator as Infinis, previously Broadview Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Hill of Fiddes approved and built?

The application was submitted on 3 September 2007. Permission was granted on 1 April 2008, 7 months later. The site became operational on 20 February 2010, 23 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3968.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode