Renewable sitesKincraig - Solar Farm and battery storage system

Kincraig - Solar Farm and battery storage system

Kincraig - Solar Farm and battery storage system is under construction in Aberdeenshire.

Capacity
as recorded in REPD
Under Construction
Status
no operational date
Battery
Technology
Renewable Connections Developments Limited
Aberdeenshire
Authority
Scotland

Planning and build timeline

Application submitted2022-04-14
Permission granted2022-10-18
6 months after submission
Operationalnot recorded

Aberdeenshire’s record on battery storage

Aberdeenshire has decided 27 battery storage schemes and approved 96%, taking a median of 5.7 months. See every battery storage scheme decision in Aberdeenshire

Other built sites within 15 km

SiteMWDistance
Kincraig - Solar Farm and battery storage system
Solar Photovoltaics · Under Construction
210 km
Hill of Fiddes
Wind Onshore · Operational
6.92.8 km
Balmcassie Commercial Park - Anaerobic digestion plant
Anaerobic Digestion · Under Construction
3.56.5 km
Black Dog
Landfill Gas · Operational
2.210.3 km
Upper Ardgrain Wind Farm
Wind Onshore · Operational
2.410.4 km
Tarbothill Landfill Site
Landfill Gas · Operational
2.211.2 km
Skelmonae Wind Farm
Wind Onshore · Operational
3.214.2 km
Farburn Place - Battery Energy Storage Facility
Battery · Under Construction
3014.4 km

How big is Kincraig - Solar Farm and battery storage system?

REPD does not record an installed capacity for Kincraig - Solar Farm and battery storage system.

Who operates Kincraig - Solar Farm and battery storage system?

REPD records the operator as Renewable Connections Developments Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Kincraig - Solar Farm and battery storage system approved and built?

The application was submitted on 2022-04-14. Permission was granted on 2022-10-18, 6 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 11178.