Renewable sites › Kincraig - Solar Farm and battery storage system
Kincraig - Solar Farm and battery storage system
Kincraig - Solar Farm and battery storage system is a battery storage site under construction in Aberdeenshire. Planning permission was granted on 18 October 2022, 6 months after submission. Operator of record: Renewable Connections Developments Limited.
Planning and build timeline
| Application submitted | 14 April 2022 |
| Permission granted | 18 October 2022 6 months after submission |
| Operational | not recorded |
Screening a site of your own?
Aberdeenshire approves 96% of battery storage schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Kincraig - Solar Farm and battery storage system’s recorded coordinate — swap in your own postcode or coordinates.
Aberdeenshire’s record on battery storage
Aberdeenshire has decided 27 battery storage schemes and approved 96%, taking a median of 5.7 months. See every battery storage scheme decision in Aberdeenshire →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Solar Photovoltaics · Under Construction | 21 | 0 km |
Wind Onshore · Operational | 6.9 | 2.8 km |
Anaerobic Digestion · Under Construction | 3.5 | 6.5 km |
Landfill Gas · Operational | 2.2 | 10.3 km |
Wind Onshore · Operational | 2.4 | 10.4 km |
Landfill Gas · Operational | 2.2 | 11.2 km |
Wind Onshore · Operational | 3.2 | 14.2 km |
Battery · Under Construction | 30 | 14.4 km |
How big is Kincraig - Solar Farm and battery storage system?
REPD does not record an installed capacity for Kincraig - Solar Farm and battery storage system.
Who operates Kincraig - Solar Farm and battery storage system?
REPD records the operator as Renewable Connections Developments Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Kincraig - Solar Farm and battery storage system approved and built?
The application was submitted on 14 April 2022. Permission was granted on 18 October 2022, 6 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 11178.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode