Renewable sites › Tye Lane - Solar Farm
Tye Lane - Solar Farm
Tye Lane - Solar Farm is under construction in Mid Suffolk with a recorded capacity of 49.9 MW.
Planning and build timeline
| Application submitted | 2021-09-02 |
| Permission granted | 2023-12-18 27 months after submission |
| Operational | not recorded |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 2 agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Mid Suffolk’s record on solar
Mid Suffolk has decided 17 solar farms and approved 88%, taking a median of 5.7 months. See every solar farm decision in Mid Suffolk →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Tye Lane - Solar Farm Battery · Operational | — | 0 km |
Bullen Lane - Battery Storage Battery · Under Construction | 100 | 1.4 km |
Bramford Substation Battery · Operational | 57 | 1.5 km |
Great Blakenham EfW EfW Incineration · Operational | 20 | 2.7 km |
Masons Power Plant Landfill Scheme Landfill Gas · Operational | 5.5 | 2.8 km |
University Of Suffolk Campus North Battery · Operational | — | 6.9 km |
Mid Suffolk Home Solar Scheme Solar Photovoltaics · Operational | 4.8 | 8.2 km |
Ipswich Hospital Energy Centre Biomass (dedicated) · Operational | 2.6 | 8.8 km |
How big is Tye Lane - Solar Farm?
Tye Lane - Solar Farm has a recorded installed capacity of 49.9 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Tye Lane - Solar Farm?
REPD records the operator as EDF Energy Renewables. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Tye Lane - Solar Farm approved and built?
The application was submitted on 2021-09-02. Permission was granted on 2023-12-18, 27 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 9610.