Novarly ParcelRenewable sites

Renewable sitesIpswich Hospital Energy Centre

Ipswich Hospital Energy Centre

Ipswich Hospital Energy Centre is operational in Ipswich with a recorded capacity of 2.6 MW, and has been generating since 2017-03-15.

2.6 MW
Capacity
as recorded in REPD
Operational
Status
since 2017-03-15
Biomass (dedicated)
Technology
Naturegen Energy Centre
Ipswich
Authority
England

Planning and build timeline

Application submitted2012-12-24
Permission granted2013-02-19
2 months after submission
Operational2017-03-15
49 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
University Of Suffolk Campus North
Battery · Operational
2.3 km
Foxhall Landfill Site
Landfill Gas · Operational
1.24.6 km
Foxburrow Farm
Solar Photovoltaics · Operational
86.1 km
Bullen Lane - Battery Storage
Battery · Under Construction
1007.4 km
Stratton Hall Solar Park
Solar Photovoltaics · Operational
11.68.1 km
Great Blakenham EfW
EfW Incineration · Operational
208.6 km
Tye Lane - Solar Farm
Battery · Operational
8.8 km
Tye Lane - Solar Farm
Solar Photovoltaics · Under Construction
49.98.8 km

How big is Ipswich Hospital Energy Centre?

Ipswich Hospital Energy Centre has a recorded installed capacity of 2.6 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Ipswich Hospital Energy Centre?

REPD records the operator as Naturegen Energy Centre. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Ipswich Hospital Energy Centre approved and built?

The application was submitted on 2012-12-24. Permission was granted on 2013-02-19, 2 months later. The site became operational on 2017-03-15, 49 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6507.