Renewable sites › University Of Suffolk Campus North
University Of Suffolk Campus North
University Of Suffolk Campus North is operational in Ipswich, and has been generating since 2021-01-01.
Planning and build timeline
| Application submitted | 2020-03-12 |
| Permission granted | 2021-09-06 18 months after submission |
| Operational | 2021-01-01 |
What this site sits on
The recorded coordinate falls on land surveyed as Urban agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Ipswich’s record on battery storage
Ipswich has decided 9 battery storage schemes and approved 100%, taking a median of 1.8 months. See every battery storage scheme decision in Ipswich →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Ipswich Hospital Energy Centre Biomass (dedicated) · Operational | 2.6 | 2.3 km |
Bullen Lane - Battery Storage Battery · Under Construction | 100 | 5.5 km |
Foxhall Landfill Site Landfill Gas · Operational | 1.2 | 6.8 km |
Tye Lane - Solar Farm Battery · Operational | — | 6.9 km |
Tye Lane - Solar Farm Solar Photovoltaics · Under Construction | 49.9 | 6.9 km |
Bramford Substation Battery · Operational | 57 | 7.2 km |
Great Blakenham EfW EfW Incineration · Operational | 20 | 7.2 km |
Foxburrow Farm Solar Photovoltaics · Operational | 8 | 8.2 km |
How big is University Of Suffolk Campus North?
REPD does not record an installed capacity for University Of Suffolk Campus North.
Who operates University Of Suffolk Campus North?
REPD records the operator as Suffolk County Council. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was University Of Suffolk Campus North approved and built?
The application was submitted on 2020-03-12. Permission was granted on 2021-09-06, 18 months later. The site became operational on 2021-01-01.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 7736.