Mid Suffolk Home Solar Scheme
Mid Suffolk Home Solar Scheme is an operational 4.8 MW solar farm in Mid Suffolk, generating since 30 January 2016. REPD does not record the planning grant date. Operator of record: Mid Suffolk District Council.
Planning and build timeline
| Application submitted | not recorded |
| Permission granted | not recorded |
| Operational | 30 January 2016 |
Screening a site of your own?
Mid Suffolk approves 88% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Mid Suffolk Home Solar Scheme’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Mid Suffolk’s record on solar
Mid Suffolk has decided 17 solar farms and approved 88%, taking a median of 5.7 months. See every solar farm decision in Mid Suffolk →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Landfill Gas · Operational | 5.5 | 5.8 km |
EfW Incineration · Operational | 20 | 6.9 km |
Battery · Operational | — | 8.2 km |
Solar Photovoltaics · Under Construction | 49.9 | 8.2 km |
Battery · Operational | 57 | 9.2 km |
Battery · Under Construction | 100 | 9.3 km |
Solar Photovoltaics · Operational | 2.8 | 13.4 km |
Battery · Operational | — | 14.1 km |
How big is Mid Suffolk Home Solar Scheme?
Mid Suffolk Home Solar Scheme has a recorded installed capacity of 4.8 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Mid Suffolk Home Solar Scheme?
REPD records the operator as Mid Suffolk District Council. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Mid Suffolk Home Solar Scheme approved and built?
REPD does not record a submission date. REPD does not record a grant date. The site became operational on 30 January 2016.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1894.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode