Novarly ParcelRenewable sites

Renewable sitesMid Suffolk Home Solar Scheme

Mid Suffolk Home Solar Scheme

Mid Suffolk Home Solar Scheme is operational in Mid Suffolk with a recorded capacity of 4.8 MW, and has been generating since 2016-01-30.

4.8 MW
Capacity
as recorded in REPD
Operational
Status
since 2016-01-30
Solar Photovoltaics
Technology
Mid Suffolk District Council
Mid Suffolk
Authority
England

Planning and build timeline

Application submittednot recorded
Permission grantednot recorded
Operational2016-01-30

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Mid Suffolk’s record on solar

Mid Suffolk has decided 17 solar farms and approved 88%, taking a median of 5.7 months. See every solar farm decision in Mid Suffolk

Other built sites within 15 km

SiteMWDistance
Masons Power Plant Landfill Scheme
Landfill Gas · Operational
5.55.8 km
Great Blakenham EfW
EfW Incineration · Operational
206.9 km
Tye Lane - Solar Farm
Battery · Operational
8.2 km
Tye Lane - Solar Farm
Solar Photovoltaics · Under Construction
49.98.2 km
Bramford Substation
Battery · Operational
579.2 km
Bullen Lane - Battery Storage
Battery · Under Construction
1009.3 km
Babergh Home Solar Scheme
Solar Photovoltaics · Operational
2.813.4 km
University Of Suffolk Campus North
Battery · Operational
14.1 km

How big is Mid Suffolk Home Solar Scheme?

Mid Suffolk Home Solar Scheme has a recorded installed capacity of 4.8 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Mid Suffolk Home Solar Scheme?

REPD records the operator as Mid Suffolk District Council. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Mid Suffolk Home Solar Scheme approved and built?

REPD does not record a submission date. REPD does not record a grant date. The site became operational on 2016-01-30.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1894.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council