Renewable sitesGreat Blakenham EfW

Great Blakenham EfW

Great Blakenham EfW is operational in Mid Suffolk with a recorded capacity of 20 MW, and has been generating since 2014-12-02.

20 MW
Capacity
as recorded in REPD
Operational
Status
since 2014-12-02
EfW Incineration
Technology
SITA UK
Mid Suffolk
Authority
England

Planning and build timeline

Application submitted2011-01-10
Permission granted2011-08-08
7 months after submission
Operational2014-12-02
40 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 2 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Masons Power Plant Landfill Scheme
Landfill Gas · Operational
5.51.3 km
Tye Lane - Solar Farm
Battery · Operational
2.7 km
Tye Lane - Solar Farm
Solar Photovoltaics · Under Construction
49.92.7 km
Bullen Lane - Battery Storage
Battery · Under Construction
1003 km
Bramford Substation
Battery · Operational
574.1 km
Mid Suffolk Home Solar Scheme
Solar Photovoltaics · Operational
4.86.9 km
University Of Suffolk Campus North
Battery · Operational
7.2 km
Ipswich Hospital Energy Centre
Biomass (dedicated) · Operational
2.68.6 km

How big is Great Blakenham EfW?

Great Blakenham EfW has a recorded installed capacity of 20 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Great Blakenham EfW?

REPD records the operator as SITA UK. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Great Blakenham EfW approved and built?

The application was submitted on 2011-01-10. Permission was granted on 2011-08-08, 7 months later. The site became operational on 2014-12-02, 40 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 997.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council