Bullen Lane - Battery Storage is under construction in Mid Suffolk with a recorded capacity of 100 MW.

100 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Battery
Technology
Cambridge Power Limited / Pivot Power
Mid Suffolk
Authority
England

Planning and build timeline

Application submitted2021-10-05
Permission granted2022-01-05
3 months after submission
Operationalnot recorded

What this site sits on

The recorded coordinate falls on land surveyed as Grade 2 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Mid Suffolk’s record on battery storage

Mid Suffolk has decided 11 battery storage schemes and approved 100%, taking a median of 5.8 months. See every battery storage scheme decision in Mid Suffolk

Other built sites within 15 km

SiteMWDistance
Tye Lane - Solar Farm
Battery · Operational
1.4 km
Tye Lane - Solar Farm
Solar Photovoltaics · Under Construction
49.91.4 km
Bramford Substation
Battery · Operational
572.1 km
Great Blakenham EfW
EfW Incineration · Operational
203 km
Masons Power Plant Landfill Scheme
Landfill Gas · Operational
5.53.6 km
University Of Suffolk Campus North
Battery · Operational
5.5 km
Ipswich Hospital Energy Centre
Biomass (dedicated) · Operational
2.67.4 km
Mid Suffolk Home Solar Scheme
Solar Photovoltaics · Operational
4.89.3 km

How big is Bullen Lane - Battery Storage?

Bullen Lane - Battery Storage has a recorded installed capacity of 100 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Bullen Lane - Battery Storage?

REPD records the operator as Cambridge Power Limited / Pivot Power. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Bullen Lane - Battery Storage approved and built?

The application was submitted on 2021-10-05. Permission was granted on 2022-01-05, 3 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 10311.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council