Renewable sites › Bullen Lane - Battery Storage
Bullen Lane - Battery Storage
Bullen Lane - Battery Storage is under construction in Mid Suffolk with a recorded capacity of 100 MW.
Planning and build timeline
| Application submitted | 2021-10-05 |
| Permission granted | 2022-01-05 3 months after submission |
| Operational | not recorded |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 2 agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Mid Suffolk’s record on battery storage
Mid Suffolk has decided 11 battery storage schemes and approved 100%, taking a median of 5.8 months. See every battery storage scheme decision in Mid Suffolk →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Tye Lane - Solar Farm Battery · Operational | — | 1.4 km |
Tye Lane - Solar Farm Solar Photovoltaics · Under Construction | 49.9 | 1.4 km |
Bramford Substation Battery · Operational | 57 | 2.1 km |
Great Blakenham EfW EfW Incineration · Operational | 20 | 3 km |
Masons Power Plant Landfill Scheme Landfill Gas · Operational | 5.5 | 3.6 km |
University Of Suffolk Campus North Battery · Operational | — | 5.5 km |
Ipswich Hospital Energy Centre Biomass (dedicated) · Operational | 2.6 | 7.4 km |
Mid Suffolk Home Solar Scheme Solar Photovoltaics · Operational | 4.8 | 9.3 km |
How big is Bullen Lane - Battery Storage?
Bullen Lane - Battery Storage has a recorded installed capacity of 100 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Bullen Lane - Battery Storage?
REPD records the operator as Cambridge Power Limited / Pivot Power. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Bullen Lane - Battery Storage approved and built?
The application was submitted on 2021-10-05. Permission was granted on 2022-01-05, 3 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 10311.
Novarly Parcel · official public data, read properly · parcel.novarly.com