Renewable sites › Twin Tumps Way - Solar Panels
Twin Tumps Way - Solar Panels
Twin Tumps Way - Solar Panels is an operational 0.62 MW solar farm in Greenwich, generating since 28 May 2022. Planning permission was granted on 15 December 2022, 10 months after submission. Operator of record: WM Morrisons Supermarkets Plc.
Planning and build timeline
| Application submitted | 22 February 2022 |
| Permission granted | 15 December 2022 10 months after submission |
| Operational | 28 May 2022 |
Screening a site of your own?
Greenwich approves 54% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Twin Tumps Way - Solar Panels’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Urban agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Greenwich’s record on solar
Greenwich has decided 13 solar farms and approved 54%, taking a median of 1.8 months. See every solar farm decision in Greenwich →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Biomass (dedicated) · Operational | 8 | 1.5 km |
Biomass (dedicated) · Operational | 19 | 1.7 km |
Solar Photovoltaics · Operational | 1.5 | 2.4 km |
Wind Onshore · Operational | 2.2 | 2.7 km |
Sewage Sludge Digestion · Operational | 5.8 | 2.7 km |
Wind Onshore · Operational | 2.5 | 2.7 km |
Sewage Sludge Digestion · Operational | 5.7 | 2.7 km |
Anaerobic Digestion · Operational | 1.4 | 2.9 km |
How big is Twin Tumps Way - Solar Panels?
Twin Tumps Way - Solar Panels has a recorded installed capacity of 0.62 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Twin Tumps Way - Solar Panels?
REPD records the operator as WM Morrisons Supermarkets Plc. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Twin Tumps Way - Solar Panels approved and built?
The application was submitted on 22 February 2022. Permission was granted on 15 December 2022, 10 months later. The site became operational on 28 May 2022.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 10758.
Novarly Parcel · official public data, read properly · parcel.novarly.com