Novarly ParcelRenewable sites

Renewable sitesCrossness Sewage Works

Crossness Sewage Works

Crossness Sewage Works is operational in Bexley with a recorded capacity of 5.7 MW, and has been generating since 2016-06-30.

5.7 MW
Capacity
as recorded in REPD
Operational
Status
since 2016-06-30
Sewage Sludge Digestion
Technology
Thames Water Utilities
Bexley
Authority
England

Planning and build timeline

Application submitted2012-07-23
Permission granted2012-10-19
3 months after submission
Operational2016-06-30
44 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Crossness Sewage Works Turbine
Wind Onshore · Operational
2.50 km
Crossness Sewage Works PV
Solar Photovoltaics · Operational
1.50.7 km
Riverside Resource Recovery Facility Battery Storage
Battery · Under Construction
2.51 km
Ford Wind Park - Dagenham
Wind Onshore · Operational
5.91.9 km
East Dagenham Docks AD (AD)
Anaerobic Digestion · Operational
1.42.1 km
Dagenham Docks Biogas (Waste AD)
Anaerobic Digestion · Operational
1.42.5 km
Twin Tumps Way - Solar Panels
Solar Photovoltaics · Operational
0.622.7 km
Ford Motor Company Ltd (Extension)
Wind Onshore · Operational
23 km

How big is Crossness Sewage Works?

Crossness Sewage Works has a recorded installed capacity of 5.7 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Crossness Sewage Works?

REPD records the operator as Thames Water Utilities. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Crossness Sewage Works approved and built?

The application was submitted on 2012-07-23. Permission was granted on 2012-10-19, 3 months later. The site became operational on 2016-06-30, 44 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6161.