Novarly ParcelRenewable sites

Renewable sitesCrossness Sewage Works PV

Crossness Sewage Works PV

Crossness Sewage Works PV is operational in Bexley with a recorded capacity of 1.5 MW, and has been generating since 2011-07-27.

1.5 MW
Capacity
as recorded in REPD
Operational
Status
since 2011-07-27
Solar Photovoltaics
Technology
Thames Water Utilities
Bexley
Authority
England

Planning and build timeline

Application submittednot recorded
Permission grantednot recorded
Operational2011-07-27

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Bexley’s record on solar

Bexley has decided 7 solar farms and approved 100%, taking a median of 1.8 months. See every solar farm decision in Bexley

Other built sites within 15 km

SiteMWDistance
Crossness Sewage Works Turbine
Wind Onshore · Operational
2.50.7 km
Crossness Sewage Works
Sewage Sludge Digestion · Operational
5.70.7 km
Riverside Resource Recovery Facility Battery Storage
Battery · Under Construction
2.51.3 km
East Dagenham Docks AD (AD)
Anaerobic Digestion · Operational
1.41.5 km
Ford Wind Park - Dagenham
Wind Onshore · Operational
5.91.5 km
Dagenham Docks Biogas (Waste AD)
Anaerobic Digestion · Operational
1.41.8 km
Twin Tumps Way - Solar Panels
Solar Photovoltaics · Operational
0.622.4 km
Ford Motor Company Ltd (Extension)
Wind Onshore · Operational
22.5 km

How big is Crossness Sewage Works PV?

Crossness Sewage Works PV has a recorded installed capacity of 1.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Crossness Sewage Works PV?

REPD records the operator as Thames Water Utilities. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Crossness Sewage Works PV approved and built?

REPD does not record a submission date. REPD does not record a grant date. The site became operational on 2011-07-27.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2385.