Renewable sites › Trondheim Way Battery energy storage
Trondheim Way Battery energy storage
Trondheim Way Battery energy storage is an 80 MW battery storage site under construction in North East Lincolnshire. Planning permission was granted on 23 January 2023, 23 months after submission. Operator of record: Vox Burns Limited.
Planning and build timeline
| Application submitted | 17 February 2021 |
| Permission granted | 23 January 2023 23 months after submission |
| Operational | not recorded |
Screening a site of your own?
North East Lincolnshire approves 100% of battery storage schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Trondheim Way Battery energy storage’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
North East Lincolnshire’s record on battery storage
North East Lincolnshire has decided 8 battery storage schemes and approved 100%, taking a median of 9.4 months. See every battery storage scheme decision in North East Lincolnshire →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Landfill Gas · Operational | 1 | 0.8 km |
Landfill Gas · Operational | 2 | 0.8 km |
EfW Incineration · Operational | 3.2 | 1.2 km |
Solar Photovoltaics · Under Construction | 49.9 | 5.2 km |
Solar Photovoltaics · Operational | 1.08 | 5.2 km |
Solar Photovoltaics · Operational | 1.12 | 6.3 km |
Solar Photovoltaics · Under Construction | 0.36 | 8.1 km |
Solar Photovoltaics · Operational | 20 | 8.7 km |
How big is Trondheim Way Battery energy storage?
Trondheim Way Battery energy storage has a recorded installed capacity of 80 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Trondheim Way Battery energy storage?
REPD records the operator as Vox Burns Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Trondheim Way Battery energy storage approved and built?
The application was submitted on 17 February 2021. Permission was granted on 23 January 2023, 23 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 8455.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode