Trondheim Way Battery energy storage

Trondheim Way Battery energy storage is an 80 MW battery storage site under construction in North East Lincolnshire. Planning permission was granted on 23 January 2023, 23 months after submission. Operator of record: Vox Burns Limited.

80 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Battery
Technology
Vox Burns Limited
North East Lincolnshire
Authority
England

Planning and build timeline

Application submitted17 February 2021
Permission granted23 January 2023
23 months after submission
Operationalnot recorded

Screening a site of your own?

RedlineUK · £39

North East Lincolnshire approves 100% of battery storage schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Trondheim Way Battery energy storage’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented battery storage scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

North East Lincolnshire’s record on battery storage

North East Lincolnshire has decided 8 battery storage schemes and approved 100%, taking a median of 9.4 months. See every battery storage scheme decision in North East Lincolnshire

Other built sites within 15 km

SiteMWDistance
Landfill Gas · Operational
10.8 km
Landfill Gas · Operational
20.8 km
EfW Incineration · Operational
3.21.2 km
Solar Photovoltaics · Under Construction
49.95.2 km
Solar Photovoltaics · Operational
1.085.2 km
Solar Photovoltaics · Operational
1.126.3 km
Solar Photovoltaics · Under Construction
0.368.1 km
Solar Photovoltaics · Operational
208.7 km

How big is Trondheim Way Battery energy storage?

Trondheim Way Battery energy storage has a recorded installed capacity of 80 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Trondheim Way Battery energy storage?

REPD records the operator as Vox Burns Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Trondheim Way Battery energy storage approved and built?

The application was submitted on 17 February 2021. Permission was granted on 23 January 2023, 23 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 8455.