Novarly ParcelRenewable sites

Renewable sitesImmingham Landfill Scheme

Immingham Landfill Scheme

Immingham Landfill Scheme is an operational 1 MW landfill gas site in North East Lincolnshire, generating since 1 March 1999. Planning permission was granted on 2 June 1994, 3 months after submission. Operator of record: Winerton Power Ltd.

1 MW
Capacity
as recorded in REPD
Operational
Status
since 1 March 1999
Landfill Gas
Technology
Winerton Power Ltd
North East Lincolnshire
Authority
England

Planning and build timeline

Application submitted2 March 1994
Permission granted2 June 1994
3 months after submission
Operational1 March 1999
57 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in North East Lincolnshire: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Immingham Landfill Scheme’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Landfill Gas · Operational
20 km
Battery · Under Construction
800.8 km
EfW Incineration · Operational
3.21.9 km
Solar Photovoltaics · Under Construction
49.96 km
Solar Photovoltaics · Operational
1.086 km
Solar Photovoltaics · Operational
1.127.1 km
Wind Onshore · Operational
7.58.6 km
Solar Photovoltaics · Under Construction
0.368.8 km

How big is Immingham Landfill Scheme?

Immingham Landfill Scheme has a recorded installed capacity of 1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Immingham Landfill Scheme?

REPD records the operator as Winerton Power Ltd. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Immingham Landfill Scheme approved and built?

The application was submitted on 2 March 1994. Permission was granted on 2 June 1994, 3 months later. The site became operational on 1 March 1999, 57 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 618.

Novarly Parcel · official public data, read properly · parcel.novarly.com