N H Case Limited - Solar Panels
N H Case Limited - Solar Panels is a 0.36 MW solar farm under construction in North East Lincolnshire. Planning permission was granted on 17 August 2022, 11 months after submission. Operator of record: N H Case Limited.
Planning and build timeline
| Application submitted | 20 September 2021 |
| Permission granted | 17 August 2022 11 months after submission |
| Operational | not recorded |
Screening a site of your own?
North East Lincolnshire approves 96% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with N H Case Limited - Solar Panels’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Urban agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
North East Lincolnshire’s record on solar
North East Lincolnshire has decided 27 solar farms and approved 96%, taking a median of 2.7 months. See every solar farm decision in North East Lincolnshire →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Solar Photovoltaics · Operational | 1.12 | 2.1 km |
Solar Photovoltaics · Operational | 1.08 | 3.4 km |
Solar Photovoltaics · Operational | 0.5 | 4.4 km |
Solar Photovoltaics · Operational | 20 | 6.3 km |
EfW Incineration · Operational | 3.2 | 6.9 km |
Solar Photovoltaics · Under Construction | 49.9 | 7.1 km |
Solar Photovoltaics · Operational | 27.1 | 7.6 km |
Battery · Under Construction | 80 | 8.1 km |
How big is N H Case Limited - Solar Panels?
N H Case Limited - Solar Panels has a recorded installed capacity of 0.36 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates N H Case Limited - Solar Panels?
REPD records the operator as N H Case Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was N H Case Limited - Solar Panels approved and built?
The application was submitted on 20 September 2021. Permission was granted on 17 August 2022, 11 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 10303.