Grimsby West, Birchin Way - Solar Array is operational in North East Lincolnshire with a recorded capacity of 1.12 MW, and has been generating since 2024-01-01.

1.12 MW
Capacity
as recorded in REPD
Operational
Status
since 2024-01-01
Solar Photovoltaics
Technology
HSH Coldstores
North East Lincolnshire
Authority
England

Planning and build timeline

Application submitted2023-03-01
Permission granted2023-05-17
3 months after submission
Operational2024-01-01
8 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

North East Lincolnshire’s record on solar

North East Lincolnshire has decided 27 solar farms and approved 96%, taking a median of 2.7 months. See every solar farm decision in North East Lincolnshire

Other built sites within 15 km

SiteMWDistance
HSH Coldstores, Estate Road - Solar Panels
Solar Photovoltaics · Operational
1.081.4 km
N H Case Limited - Solar Panels
Solar Photovoltaics · Under Construction
0.362.1 km
Grimsby Solar Farm
Solar Photovoltaics · Under Construction
49.95.1 km
Low Farm Solar Array
Solar Photovoltaics · Operational
205.1 km
Newlincs EfW
EfW Incineration · Operational
3.25.1 km
Hewitts Avenue Tesco
Solar Photovoltaics · Operational
0.55.4 km
Laceby Solar Farm
Solar Photovoltaics · Operational
27.16.3 km
Trondheim Way Battery energy storage
Battery · Under Construction
806.3 km

How big is Grimsby West, Birchin Way - Solar Array?

Grimsby West, Birchin Way - Solar Array has a recorded installed capacity of 1.12 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Grimsby West, Birchin Way - Solar Array?

REPD records the operator as HSH Coldstores. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Grimsby West, Birchin Way - Solar Array approved and built?

The application was submitted on 2023-03-01. Permission was granted on 2023-05-17, 3 months later. The site became operational on 2024-01-01, 8 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 13370.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council