Newlincs EfW is an operational 3.2 MW energy-from-waste plant in North East Lincolnshire, generating since 1 April 2004. Planning permission was granted on 5 January 2001, 7 months after submission. Operator of record: Newlincs Developments.
Planning and build timeline
| Application submitted | 24 May 2000 |
| Permission granted | 5 January 2001 7 months after submission |
| Operational | 1 April 2004 39 months after consent |
Screening a site of your own?
Redline runs the record on your own boundary in North East Lincolnshire: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Newlincs EfW’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Battery · Under Construction | 80 | 1.2 km |
Landfill Gas · Operational | 1 | 1.9 km |
Landfill Gas · Operational | 2 | 1.9 km |
Solar Photovoltaics · Operational | 1.08 | 4.1 km |
Solar Photovoltaics · Under Construction | 49.9 | 4.7 km |
Solar Photovoltaics · Operational | 1.12 | 5.1 km |
Solar Photovoltaics · Under Construction | 0.36 | 6.9 km |
Solar Photovoltaics · Operational | 20 | 7.9 km |
How big is Newlincs EfW?
Newlincs EfW has a recorded installed capacity of 3.2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Newlincs EfW?
REPD records the operator as Newlincs Developments. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Newlincs EfW approved and built?
The application was submitted on 24 May 2000. Permission was granted on 5 January 2001, 7 months later. The site became operational on 1 April 2004, 39 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 850.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode