Novarly ParcelRenewable sites

Renewable sitesNewlincs EfW

Newlincs EfW

Newlincs EfW is operational in North East Lincolnshire with a recorded capacity of 3.2 MW, and has been generating since 2004-04-01.

3.2 MW
Capacity
as recorded in REPD
Operational
Status
since 2004-04-01
EfW Incineration
Technology
Newlincs Developments
North East Lincolnshire
Authority
England

Planning and build timeline

Application submitted2000-05-24
Permission granted2001-01-05
7 months after submission
Operational2004-04-01
39 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Trondheim Way Battery energy storage
Battery · Under Construction
801.2 km
Immingham Landfill Scheme
Landfill Gas · Operational
11.9 km
Immingham
Landfill Gas · Operational
21.9 km
HSH Coldstores, Estate Road - Solar Panels
Solar Photovoltaics · Operational
1.084.1 km
Grimsby Solar Farm
Solar Photovoltaics · Under Construction
49.94.7 km
Grimsby West, Birchin Way - Solar Array
Solar Photovoltaics · Operational
1.125.1 km
N H Case Limited - Solar Panels
Solar Photovoltaics · Under Construction
0.366.9 km
Low Farm Solar Array
Solar Photovoltaics · Operational
207.9 km

How big is Newlincs EfW?

Newlincs EfW has a recorded installed capacity of 3.2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Newlincs EfW?

REPD records the operator as Newlincs Developments. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Newlincs EfW approved and built?

The application was submitted on 2000-05-24. Permission was granted on 2001-01-05, 7 months later. The site became operational on 2004-04-01, 39 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 850.

Novarly Parcel · official public data, read properly · parcel.novarly.com