Novarly ParcelRenewable sites

Renewable sitesLow Farm Solar Array

Low Farm Solar Array

Low Farm Solar Array is operational in North East Lincolnshire with a recorded capacity of 20 MW, and has been generating since 2022-10-01.

20 MW
Capacity
as recorded in REPD
Operational
Status
since 2022-10-01
Solar Photovoltaics
Technology
Wirsol / Island Green Power
North East Lincolnshire
Authority
England

Planning and build timeline

Application submitted2015-06-25
Permission granted2015-10-09
3 months after submission
Operational2022-10-01
84 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

North East Lincolnshire’s record on solar

North East Lincolnshire has decided 27 solar farms and approved 96%, taking a median of 2.7 months. See every solar farm decision in North East Lincolnshire

Other built sites within 15 km

SiteMWDistance
Laceby Solar Farm
Solar Photovoltaics · Operational
27.11.2 km
Grimsby Solar Farm
Solar Photovoltaics · Under Construction
49.94 km
HSH Coldstores, Estate Road - Solar Panels
Solar Photovoltaics · Operational
1.084.7 km
Grimsby West, Birchin Way - Solar Array
Solar Photovoltaics · Operational
1.125.1 km
Hewitts Avenue Tesco
Solar Photovoltaics · Operational
0.55.9 km
N H Case Limited - Solar Panels
Solar Photovoltaics · Under Construction
0.366.3 km
Newlincs EfW
EfW Incineration · Operational
3.27.9 km
Trondheim Way Battery energy storage
Battery · Under Construction
808.7 km

How big is Low Farm Solar Array?

Low Farm Solar Array has a recorded installed capacity of 20 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Low Farm Solar Array?

REPD records the operator as Wirsol / Island Green Power. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Low Farm Solar Array approved and built?

The application was submitted on 2015-06-25. Permission was granted on 2015-10-09, 3 months later. The site became operational on 2022-10-01, 84 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5444.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council