Renewable sitesBrazier Landfill Scheme

Brazier Landfill Scheme

Brazier Landfill Scheme is an operational 3.9 MW landfill gas site in East Hertfordshire, generating since 15 December 1997. Planning permission was granted on 8 May 1997, 7 months after submission. Operator of record: Pioneer Aggregates (UK) Ltd.

3.9 MW
Capacity
as recorded in REPD
Operational
Status
since 15 December 1997
Landfill Gas
Technology
Pioneer Aggregates (UK) Ltd
East Hertfordshire
Authority
England

Planning and build timeline

Application submitted10 October 1996
Permission granted8 May 1997
7 months after submission
Operational15 December 1997
7 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in East Hertfordshire: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Brazier Landfill Scheme’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Non Agricultural agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Landfill Gas · Operational
2.60.7 km
Anaerobic Digestion · Operational
36.7 km
Advanced Conversion Technologies · Under Construction
9.66.7 km
Anaerobic Digestion · Operational
2.36.8 km
Solar Photovoltaics · Operational
510.2 km
Anaerobic Digestion · Operational
1.210.7 km
Anaerobic Digestion · Operational
1.513.9 km
Solar Photovoltaics · Under Construction
213.9 km

How big is Brazier Landfill Scheme?

Brazier Landfill Scheme has a recorded installed capacity of 3.9 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Brazier Landfill Scheme?

REPD records the operator as Pioneer Aggregates (UK) Ltd. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Brazier Landfill Scheme approved and built?

The application was submitted on 10 October 1996. Permission was granted on 8 May 1997, 7 months later. The site became operational on 15 December 1997, 7 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 507.