Renewable sitesBrazier Landfill Scheme

Brazier Landfill Scheme

Brazier Landfill Scheme is operational in East Hertfordshire with a recorded capacity of 3.9 MW, and has been generating since 1997-12-15.

3.9 MW
Capacity
as recorded in REPD
Operational
Status
since 1997-12-15
Landfill Gas
Technology
Pioneer Aggregates (UK) Ltd
East Hertfordshire
Authority
England

Planning and build timeline

Application submitted1996-10-10
Permission granted1997-05-08
7 months after submission
Operational1997-12-15
7 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Non Agricultural agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Westmill Qaurry
Landfill Gas · Operational
2.60.7 km
Ratty's Lane Sustainable Energy Facility (Waste AD)
Anaerobic Digestion · Operational
36.7 km
Ratty's Lane Sustainable Energy Facility (ACT)
Advanced Conversion Technologies · Under Construction
9.66.7 km
Rye Meads Sewerage Treatment Works
Anaerobic Digestion · Operational
2.36.8 km
Mill Farm
Solar Photovoltaics · Operational
510.2 km
The Nurseries, Green Tye
Anaerobic Digestion · Operational
1.210.7 km
Cattlegate Farm Biogas (Farm AD)
Anaerobic Digestion · Operational
1.513.9 km
Computacenter Warehouse
Solar Photovoltaics · Under Construction
213.9 km

How big is Brazier Landfill Scheme?

Brazier Landfill Scheme has a recorded installed capacity of 3.9 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Brazier Landfill Scheme?

REPD records the operator as Pioneer Aggregates (UK) Ltd. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Brazier Landfill Scheme approved and built?

The application was submitted on 1996-10-10. Permission was granted on 1997-05-08, 7 months later. The site became operational on 1997-12-15, 7 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 507.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council