TF and JH Braime Holdings Factory

TF and JH Braime Holdings Factory is an operational 0.2 MW solar farm in Leeds, generating since 1 October 2020. Planning permission was granted on 11 April 2019, 2 months after submission. Operator of record: TF and JH Braime.

0.2 MW
Capacity
as recorded in REPD
Operational
Status
since 1 October 2020
Solar Photovoltaics
Technology
TF and JH Braime
Leeds
Authority
England

Planning and build timeline

Application submitted30 January 2019
Permission granted11 April 2019
2 months after submission
Operational1 October 2020
18 months after consent

Screening a site of your own?

RedlineUK · £39

Leeds approves 98% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with TF and JH Braime Holdings Factory’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Leeds’s record on solar

Leeds has decided 55 solar farms and approved 98%, taking a median of 1.6 months. See every solar farm decision in Leeds

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
0.30.7 km
Solar Photovoltaics · Operational
0.221.7 km
Anaerobic Digestion · Operational
2.41.9 km
EfW Incineration · Operational
11.61.9 km
EfW Incineration · Under Construction
492.7 km
Anaerobic Digestion · Operational
42.9 km
Biomass (dedicated) · Operational
23 km
Landfill Gas · Operational
5.26 km

How big is TF and JH Braime Holdings Factory?

TF and JH Braime Holdings Factory has a recorded installed capacity of 0.2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates TF and JH Braime Holdings Factory?

REPD records the operator as TF and JH Braime. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was TF and JH Braime Holdings Factory approved and built?

The application was submitted on 30 January 2019. Permission was granted on 11 April 2019, 2 months later. The site became operational on 1 October 2020, 18 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 7288.