Renewable sitesLVF Packaging - Solar Panel

LVF Packaging - Solar Panel

LVF Packaging - Solar Panel is operational in Leeds with a recorded capacity of 0.3 MW, and has been generating since 2023-08-24.

0.3 MW
Capacity
as recorded in REPD
Operational
Status
since 2023-08-24
Solar Photovoltaics
Technology
LVF Packaging
Leeds
Authority
England

Planning and build timeline

Application submittednot recorded
Permission grantednot recorded
Operational2023-08-24

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Leeds’s record on solar

Leeds has decided 55 solar farms and approved 98%, taking a median of 1.6 months. See every solar farm decision in Leeds

Other built sites within 15 km

SiteMWDistance
TF and JH Braime Holdings Factory
Solar Photovoltaics · Operational
0.20.7 km
Knostrop WWTW AD
Anaerobic Digestion · Operational
2.41.3 km
Cross Green ERF
EfW Incineration · Operational
11.61.6 km
Skelton Grange � Energy Recovery Facility
EfW Incineration · Under Construction
492 km
Regent Street, Sheepscar - Solar Panels
Solar Photovoltaics · Operational
0.222.3 km
Knostrop Sewage Treatment Works
Anaerobic Digestion · Operational
42.3 km
Buslingthorpe Power Station (Leeds North)
Biomass (dedicated) · Operational
23.6 km
Skelton Grange Landfill
Landfill Gas · Operational
5.25.4 km

How big is LVF Packaging - Solar Panel?

LVF Packaging - Solar Panel has a recorded installed capacity of 0.3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates LVF Packaging - Solar Panel?

REPD records the operator as LVF Packaging. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was LVF Packaging - Solar Panel approved and built?

REPD does not record a submission date. REPD does not record a grant date. The site became operational on 2023-08-24.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 14707.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council