Renewable sites › LVF Packaging - Solar Panel
LVF Packaging - Solar Panel
LVF Packaging - Solar Panel is operational in Leeds with a recorded capacity of 0.3 MW, and has been generating since 2023-08-24.
Planning and build timeline
| Application submitted | not recorded |
| Permission granted | not recorded |
| Operational | 2023-08-24 |
What this site sits on
The recorded coordinate falls on land surveyed as Urban agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Leeds’s record on solar
Leeds has decided 55 solar farms and approved 98%, taking a median of 1.6 months. See every solar farm decision in Leeds →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
TF and JH Braime Holdings Factory Solar Photovoltaics · Operational | 0.2 | 0.7 km |
Knostrop WWTW AD Anaerobic Digestion · Operational | 2.4 | 1.3 km |
Cross Green ERF EfW Incineration · Operational | 11.6 | 1.6 km |
Skelton Grange � Energy Recovery Facility EfW Incineration · Under Construction | 49 | 2 km |
Regent Street, Sheepscar - Solar Panels Solar Photovoltaics · Operational | 0.22 | 2.3 km |
Knostrop Sewage Treatment Works Anaerobic Digestion · Operational | 4 | 2.3 km |
Buslingthorpe Power Station (Leeds North) Biomass (dedicated) · Operational | 2 | 3.6 km |
Skelton Grange Landfill Landfill Gas · Operational | 5.2 | 5.4 km |
How big is LVF Packaging - Solar Panel?
LVF Packaging - Solar Panel has a recorded installed capacity of 0.3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates LVF Packaging - Solar Panel?
REPD records the operator as LVF Packaging. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was LVF Packaging - Solar Panel approved and built?
REPD does not record a submission date. REPD does not record a grant date. The site became operational on 2023-08-24.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 14707.