Renewable sites › Knostrop WWTW AD
Knostrop WWTW AD
Knostrop WWTW AD is operational in Leeds with a recorded capacity of 2.4 MW, and has been generating since 2019-07-11.
Planning and build timeline
| Application submitted | 2013-12-11 |
| Permission granted | 2014-04-22 4 months after submission |
| Operational | 2019-07-11 63 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Urban agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Skelton Grange � Energy Recovery Facility EfW Incineration · Under Construction | 49 | 0.7 km |
Cross Green ERF EfW Incineration · Operational | 11.6 | 1 km |
Knostrop Sewage Treatment Works Anaerobic Digestion · Operational | 4 | 1.1 km |
LVF Packaging - Solar Panel Solar Photovoltaics · Operational | 0.3 | 1.3 km |
TF and JH Braime Holdings Factory Solar Photovoltaics · Operational | 0.2 | 1.9 km |
Regent Street, Sheepscar - Solar Panels Solar Photovoltaics · Operational | 0.22 | 3.1 km |
Skelton Grange Landfill Landfill Gas · Operational | 5.2 | 4.2 km |
Buslingthorpe Power Station (Leeds North) Biomass (dedicated) · Operational | 2 | 4.5 km |
How big is Knostrop WWTW AD?
Knostrop WWTW AD has a recorded installed capacity of 2.4 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Knostrop WWTW AD?
REPD records the operator as Kelda Water Services. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Knostrop WWTW AD approved and built?
The application was submitted on 2013-12-11. Permission was granted on 2014-04-22, 4 months later. The site became operational on 2019-07-11, 63 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 382.