Novarly ParcelRenewable sites

Renewable sitesTesco Crab Tree Lane

Tesco Crab Tree Lane

Tesco Crab Tree Lane is operational in Wigan with a recorded capacity of 0.5 MW, and has been generating since 2020-03-27.

0.5 MW
Capacity
as recorded in REPD
Operational
Status
since 2020-03-27
Solar Photovoltaics
Technology
Tesco Stores
Wigan
Authority
England

Planning and build timeline

Application submitted2018-12-20
Permission granted2019-02-01
1 months after submission
Operational2020-03-27
14 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Wigan’s record on solar

Wigan has decided 9 solar farms and approved 100%, taking a median of 1.8 months. See every solar farm decision in Wigan

Other built sites within 15 km

SiteMWDistance
Atherton - Battery energy storage
Battery · Operational
301.1 km
Salford Road Solar Farm
Solar Photovoltaics · Operational
2.23.4 km
Kenyon Way
Solar Photovoltaics · Under Construction
1.93.5 km
Whitehead Landfill
Landfill Gas · Operational
5.34.3 km
Kirkless Power
Landfill Gas · Operational
2.17.2 km
Bolton TRF
EfW Incineration · Operational
10.87.3 km
Salford Road
Solar Photovoltaics · Operational
1.67.6 km
Bent Spur Solar Farm
Solar Photovoltaics · Operational
57.6 km

How big is Tesco Crab Tree Lane?

Tesco Crab Tree Lane has a recorded installed capacity of 0.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Tesco Crab Tree Lane?

REPD records the operator as Tesco Stores. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Tesco Crab Tree Lane approved and built?

The application was submitted on 2018-12-20. Permission was granted on 2019-02-01, 1 months later. The site became operational on 2020-03-27, 14 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 7251.