Salford Road is an operational 1.6 MW solar farm in Bolton, generating since 30 June 2016. REPD does not record the planning grant date. Operator of record: Aldi.

1.6 MW
Capacity
as recorded in REPD
Operational
Status
since 30 June 2016
Solar Photovoltaics
Technology
Aldi
Bolton
Authority
England

Planning and build timeline

Application submittednot recorded
Permission grantednot recorded
Operational30 June 2016

Screening a site of your own?

RedlineUK · £39

Bolton approves 93% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Salford Road’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Bolton’s record on solar

Bolton has decided 15 solar farms and approved 93%, taking a median of 1.9 months. See every solar farm decision in Bolton

Other built sites within 15 km

SiteMWDistance
EfW Incineration · Operational
10.81.9 km
Solar Photovoltaics · Operational
2.24.6 km
Solar Photovoltaics · Under Construction
1.96 km
Solar Photovoltaics · Operational
56.2 km
Solar Photovoltaics · Operational
0.57.6 km
Battery · Operational
307.8 km
Battery · Operational
208.9 km
Landfill Gas · Operational
5.39.9 km

How big is Salford Road?

Salford Road has a recorded installed capacity of 1.6 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Salford Road?

REPD records the operator as Aldi. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Salford Road approved and built?

REPD does not record a submission date. REPD does not record a grant date. The site became operational on 30 June 2016.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6162.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode