Salford Road is operational in Bolton with a recorded capacity of 1.6 MW, and has been generating since 2016-06-30.

1.6 MW
Capacity
as recorded in REPD
Operational
Status
since 2016-06-30
Solar Photovoltaics
Technology
Aldi
Bolton
Authority
England

Planning and build timeline

Application submittednot recorded
Permission grantednot recorded
Operational2016-06-30

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Bolton’s record on solar

Bolton has decided 15 solar farms and approved 93%, taking a median of 1.9 months. See every solar farm decision in Bolton

Other built sites within 15 km

SiteMWDistance
Bolton TRF
EfW Incineration · Operational
10.81.9 km
Salford Road Solar Farm
Solar Photovoltaics · Operational
2.24.6 km
Kenyon Way
Solar Photovoltaics · Under Construction
1.96 km
Bent Spur Solar Farm
Solar Photovoltaics · Operational
56.2 km
Tesco Crab Tree Lane
Solar Photovoltaics · Operational
0.57.6 km
Atherton - Battery energy storage
Battery · Operational
307.8 km
Lascar Works
Battery · Operational
208.9 km
Whitehead Landfill
Landfill Gas · Operational
5.39.9 km

How big is Salford Road?

Salford Road has a recorded installed capacity of 1.6 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Salford Road?

REPD records the operator as Aldi. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Salford Road approved and built?

REPD does not record a submission date. REPD does not record a grant date. The site became operational on 2016-06-30.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6162.