Renewable sitesKirkless Power

Kirkless Power

Kirkless Power is operational in Wigan with a recorded capacity of 2.1 MW, and has been generating since 2004-12-01.

2.1 MW
Capacity
as recorded in REPD
Operational
Status
since 2004-12-01
Landfill Gas
Technology
FCC Environment
Wigan
Authority
England

Planning and build timeline

Application submitted2000-02-23
Permission granted2000-06-13
4 months after submission
Operational2004-12-01
54 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Atherton - Battery energy storage
Battery · Operational
306.2 km
Rigby Landfill
Landfill Gas · Operational
37.2 km
Tesco Crab Tree Lane
Solar Photovoltaics · Operational
0.57.2 km
Thompson House Equestrian farm
Solar Photovoltaics · Operational
58.4 km
Salford Road Solar Farm
Solar Photovoltaics · Operational
2.29.3 km
Billinge Hill Quarry Landfill Scheme
Landfill Gas · Operational
19.6 km
West Quarry
Landfill Gas · Operational
4.59.6 km
Charnock Richard - Battery Storage
Battery · Operational
309.9 km

How big is Kirkless Power?

Kirkless Power has a recorded installed capacity of 2.1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Kirkless Power?

REPD records the operator as FCC Environment. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Kirkless Power approved and built?

The application was submitted on 2000-02-23. Permission was granted on 2000-06-13, 4 months later. The site became operational on 2004-12-01, 54 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 792.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council