Renewable sites › Bent Spur Solar Farm
Bent Spur Solar Farm
Bent Spur Solar Farm is operational in Bolton with a recorded capacity of 5 MW, and has been generating since 2016-03-31.
Planning and build timeline
| Application submitted | 2015-08-24 |
| Permission granted | 2015-11-20 3 months after submission |
| Operational | 2016-03-31 4 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
- Green Belt — Bolton
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Bolton’s record on solar
Bolton has decided 15 solar farms and approved 93%, taking a median of 1.9 months. See every solar farm decision in Bolton →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Kenyon Way Solar Photovoltaics · Under Construction | 1.9 | 4.2 km |
Clifton Hall Landfill Gas · Operational | 1 | 4.3 km |
Bolton TRF EfW Incineration · Operational | 10.8 | 4.3 km |
Salford Road Solar Farm Solar Photovoltaics · Operational | 2.2 | 5 km |
Salford Road Solar Photovoltaics · Operational | 1.6 | 6.2 km |
Whitehead Landfill Landfill Gas · Operational | 5.3 | 6.7 km |
Turnpike Depot - Solar Panels Solar Photovoltaics · Under Construction | 0.48 | 7 km |
Salford Refuse Treatment Plant (AD) Anaerobic Digestion · Operational | 2 | 7.2 km |
How big is Bent Spur Solar Farm?
Bent Spur Solar Farm has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Bent Spur Solar Farm?
REPD records the operator as Active Renewables. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Bent Spur Solar Farm approved and built?
The application was submitted on 2015-08-24. Permission was granted on 2015-11-20, 3 months later. The site became operational on 2016-03-31, 4 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5723.
Novarly Parcel · official public data, read properly · parcel.novarly.com