Salford Road Solar Farm

Salford Road Solar Farm is an operational 2.2 MW solar farm in Bolton, generating since 9 August 2015. Planning permission was granted on 29 June 2015, 1 months after submission. Operator of record: Greater Manchester Waste Disposal Authority.

2.2 MW
Capacity
as recorded in REPD
Operational
Status
since 9 August 2015
Solar Photovoltaics
Technology
Greater Manchester Waste Disposal Authority
Bolton
Authority
England

Planning and build timeline

Application submitted26 May 2015
Permission granted29 June 2015
1 months after submission
Operational9 August 2015
1 months after consent

Screening a site of your own?

RedlineUK · £39

Bolton approves 93% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Salford Road Solar Farm’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Bolton’s record on solar

Bolton has decided 15 solar farms and approved 93%, taking a median of 1.9 months. See every solar farm decision in Bolton

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Under Construction
1.91.8 km
Solar Photovoltaics · Operational
0.53.4 km
Battery · Operational
303.9 km
EfW Incineration · Operational
10.84 km
Solar Photovoltaics · Operational
1.64.6 km
Solar Photovoltaics · Operational
55 km
Landfill Gas · Operational
5.35.5 km
Landfill Gas · Operational
19.3 km

How big is Salford Road Solar Farm?

Salford Road Solar Farm has a recorded installed capacity of 2.2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Salford Road Solar Farm?

REPD records the operator as Greater Manchester Waste Disposal Authority. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Salford Road Solar Farm approved and built?

The application was submitted on 26 May 2015. Permission was granted on 29 June 2015, 1 months later. The site became operational on 9 August 2015, 1 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5303.