Novarly ParcelRenewable sites

Renewable sitesKenyon Way

Kenyon Way

Kenyon Way is a 1.9 MW solar farm under construction in Salford. Planning permission was granted on 24 July 2020, 5 months after submission. Operator of record: Private Developer.

1.9 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Solar Photovoltaics
Technology
Private Developer
Salford
Authority
England

Planning and build timeline

Application submitted5 March 2020
Permission granted24 July 2020
5 months after submission
Operationalnot recorded

Screening a site of your own?

RedlineUK · £39

Salford approves 100% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Kenyon Way’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Salford’s record on solar

Salford has decided 9 solar farms and approved 100%, taking a median of 1.8 months. See every solar farm decision in Salford

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
2.21.8 km
Solar Photovoltaics · Operational
0.53.5 km
Landfill Gas · Operational
5.33.9 km
Solar Photovoltaics · Operational
54.2 km
Battery · Operational
304.4 km
EfW Incineration · Operational
10.84.9 km
Solar Photovoltaics · Operational
1.66 km
Landfill Gas · Operational
18.2 km

How big is Kenyon Way?

Kenyon Way has a recorded installed capacity of 1.9 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Kenyon Way?

REPD records the operator as Private Developer. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Kenyon Way approved and built?

The application was submitted on 5 March 2020. Permission was granted on 24 July 2020, 5 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 7738.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode