Four Elms Solar Array
Four Elms Solar Array is an operational 0.17 MW solar farm in Braintree, generating since 1 September 2021. Planning permission was granted on 1 February 2021, 4 months after submission. Operator of record: F H Nash Limited.
Planning and build timeline
| Application submitted | 1 October 2020 |
| Permission granted | 1 February 2021 4 months after submission |
| Operational | 1 September 2021 7 months after consent |
Screening a site of your own?
Braintree approves 96% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Four Elms Solar Array’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 2 agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Braintree’s record on solar
Braintree has decided 23 solar farms and approved 96%, taking a median of 3.6 months. See every solar farm decision in Braintree →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Solar Photovoltaics · Operational | 5.3 | 6.1 km |
Solar Photovoltaics · Operational | 4.9 | 6.3 km |
Solar Photovoltaics · Operational | 10.8 | 6.5 km |
Solar Photovoltaics · Operational | 6 | 7.5 km |
Solar Photovoltaics · Operational | 44 | 8.3 km |
Solar Photovoltaics · Operational | 12 | 8.3 km |
Solar Photovoltaics · Under Construction | 9.89 | 8.6 km |
Battery · Under Construction | 10 | 8.7 km |
How big is Four Elms Solar Array?
Four Elms Solar Array has a recorded installed capacity of 0.17 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Four Elms Solar Array?
REPD records the operator as F H Nash Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Four Elms Solar Array approved and built?
The application was submitted on 1 October 2020. Permission was granted on 1 February 2021, 4 months later. The site became operational on 1 September 2021, 7 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 8223.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode