Renewable sitesTarbothill Landfill Site

Tarbothill Landfill Site

Tarbothill Landfill Site is an operational 2.2 MW landfill gas site in Aberdeen City, generating since 14 November 2002. Planning permission was granted on 14 November 2002, 3 months after submission. Operator of record: Waste Recycling Group.

2.2 MW
Capacity
as recorded in REPD
Operational
Status
since 14 November 2002
Landfill Gas
Technology
Waste Recycling Group
Aberdeen City
Authority
Scotland

Planning and build timeline

Application submitted22 August 2002
Permission granted14 November 2002
3 months after submission
Operational14 November 2002
0 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Aberdeen City: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Tarbothill Landfill Site’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Other built sites within 15 km

SiteMWDistance
Landfill Gas · Operational
2.21.3 km
Battery · Under Construction
307.1 km
Wind Offshore · Operational
96.87.4 km
Solar Photovoltaics · Operational
0.39 km
EfW Incineration · Operational
11.19.5 km
Wind Onshore · Operational
6.911.2 km
Solar Photovoltaics · Under Construction
2111.2 km
Battery · Under Construction
11.2 km

How big is Tarbothill Landfill Site?

Tarbothill Landfill Site has a recorded installed capacity of 2.2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Tarbothill Landfill Site?

REPD records the operator as Waste Recycling Group. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Tarbothill Landfill Site approved and built?

The application was submitted on 22 August 2002. Permission was granted on 14 November 2002, 3 months later. The site became operational on 14 November 2002, 0 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 691.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode