Renewable sitesBlack Dog

Black Dog

Black Dog is an operational 2.2 MW landfill gas site in Aberdeenshire, generating since 30 August 2005. Planning permission was granted on 26 July 2005, 5 months after submission. Operator of record: FCC Environment.

2.2 MW
Capacity
as recorded in REPD
Operational
Status
since 30 August 2005
Landfill Gas
Technology
FCC Environment
Aberdeenshire
Authority
Scotland

Planning and build timeline

Application submitted21 February 2005
Permission granted26 July 2005
5 months after submission
Operational30 August 2005
1 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Aberdeenshire: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Black Dog’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Other built sites within 15 km

SiteMWDistance
Landfill Gas · Operational
2.21.3 km
Battery · Under Construction
308.1 km
Wind Offshore · Operational
96.88.3 km
Solar Photovoltaics · Operational
0.310 km
Battery · Under Construction
10.3 km
Solar Photovoltaics · Under Construction
2110.3 km
EfW Incineration · Operational
11.110.5 km
Wind Onshore · Operational
6.910.5 km

How big is Black Dog?

Black Dog has a recorded installed capacity of 2.2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Black Dog?

REPD records the operator as FCC Environment. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Black Dog approved and built?

The application was submitted on 21 February 2005. Permission was granted on 26 July 2005, 5 months later. The site became operational on 30 August 2005, 1 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 629.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode