Renewable sites › Black Dog
Black Dog
Black Dog is operational in Aberdeenshire with a recorded capacity of 2.2 MW, and has been generating since 2005-08-30.
Planning and build timeline
| Application submitted | 2005-02-21 |
| Permission granted | 2005-07-26 5 months after submission |
| Operational | 2005-08-30 1 months after consent |
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Tarbothill Landfill Site Landfill Gas · Operational | 2.2 | 1.3 km |
Farburn Place - Battery Energy Storage Facility Battery · Under Construction | 30 | 8.1 km |
European Offshore Wind Deployment Centre (EOWDC) (Aberdeen Bay - Demonstration site) Wind Offshore · Operational | 96.8 | 8.3 km |
Iron Mountain Howe Moss Drive Solar Photovoltaics · Operational | 0.3 | 10 km |
Kincraig - Solar Farm and battery storage system Solar Photovoltaics · Under Construction | 21 | 10.3 km |
Kincraig - Solar Farm and battery storage system Battery · Under Construction | — | 10.3 km |
Ness Energy Project EfW Incineration · Operational | 11.1 | 10.5 km |
Hill of Fiddes Wind Onshore · Operational | 6.9 | 10.5 km |
How big is Black Dog?
Black Dog has a recorded installed capacity of 2.2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Black Dog?
REPD records the operator as FCC Environment. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Black Dog approved and built?
The application was submitted on 2005-02-21. Permission was granted on 2005-07-26, 5 months later. The site became operational on 2005-08-30, 1 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 629.