European Offshore Wind Deployment Centre (EOWDC) (Aberdeen Bay - Demonstration site) is an operational 96.8 MW offshore wind farm in Scotland, generating since 7 September 2018. Planning permission was granted on 26 March 2013, 19 months after submission. Operator of record: Vattenfall.

96.8 MW
Capacity
as recorded in REPD
Operational
Status
since 7 September 2018
Wind Offshore
Technology
Vattenfall
National
Authority
Scotland

Planning and build timeline

Application submitted31 August 2011
Permission granted26 March 2013
19 months after submission
Operational7 September 2018
65 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the same record on your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with European Offshore Wind Deployment Centre (EOWDC) (Aberdeen Bay - Demonstration site)’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Other built sites within 15 km

SiteMWDistance
EfW Incineration · Operational
11.12.2 km
Landfill Gas · Operational
2.27.4 km
Landfill Gas · Operational
2.28.3 km
Battery · Under Construction
309.5 km
Solar Photovoltaics · Operational
0.310.9 km

How big is European Offshore Wind Deployment Centre (EOWDC) (Aberdeen Bay - Demonstration site)?

European Offshore Wind Deployment Centre (EOWDC) (Aberdeen Bay - Demonstration site) has a recorded installed capacity of 96.8 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates European Offshore Wind Deployment Centre (EOWDC) (Aberdeen Bay - Demonstration site)?

REPD records the operator as Vattenfall. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was European Offshore Wind Deployment Centre (EOWDC) (Aberdeen Bay - Demonstration site) approved and built?

The application was submitted on 31 August 2011. Permission was granted on 26 March 2013, 19 months later. The site became operational on 7 September 2018, 65 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2505.