Ness Energy Project
Ness Energy Project is an operational 11.1 MW energy-from-waste plant in Aberdeen City, generating since 18 December 2023. Planning permission was granted on 11 October 2016, 7 months after submission. Operator of record: Aberdeen / Aberdeenshire / Moray Councils.
Planning and build timeline
| Application submitted | 8 March 2016 |
| Permission granted | 11 October 2016 7 months after submission |
| Operational | 18 December 2023 86 months after consent |
Screening a site of your own?
Redline runs the record on your own boundary in Aberdeen City: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Ness Energy Project’s recorded coordinate — swap in your own postcode or coordinates.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Wind Offshore · Operational | 96.8 | 2.2 km |
Landfill Gas · Operational | 2.2 | 9.5 km |
Landfill Gas · Operational | 2.2 | 10.5 km |
Battery · Under Construction | 30 | 10.9 km |
Solar Photovoltaics · Operational | 0.3 | 12.1 km |
How big is Ness Energy Project?
Ness Energy Project has a recorded installed capacity of 11.1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Ness Energy Project?
REPD records the operator as Aberdeen / Aberdeenshire / Moray Councils. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Ness Energy Project approved and built?
The application was submitted on 8 March 2016. Permission was granted on 11 October 2016, 7 months later. The site became operational on 18 December 2023, 86 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5615.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode