Ness Energy Project is operational in Aberdeen City with a recorded capacity of 11.1 MW, and has been generating since 2023-12-18.

11.1 MW
Capacity
as recorded in REPD
Operational
Status
since 2023-12-18
EfW Incineration
Technology
Aberdeen / Aberdeenshire / Moray Councils
Aberdeen City
Authority
Scotland

Planning and build timeline

Application submitted2016-03-08
Permission granted2016-10-11
7 months after submission
Operational2023-12-18
86 months after consent

Other built sites within 15 km

SiteMWDistance
European Offshore Wind Deployment Centre (EOWDC) (Aberdeen Bay - Demonstration site)
Wind Offshore · Operational
96.82.2 km
Tarbothill Landfill Site
Landfill Gas · Operational
2.29.5 km
Black Dog
Landfill Gas · Operational
2.210.5 km
Farburn Place - Battery Energy Storage Facility
Battery · Under Construction
3010.9 km
Iron Mountain Howe Moss Drive
Solar Photovoltaics · Operational
0.312.1 km

How big is Ness Energy Project?

Ness Energy Project has a recorded installed capacity of 11.1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Ness Energy Project?

REPD records the operator as Aberdeen / Aberdeenshire / Moray Councils. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Ness Energy Project approved and built?

The application was submitted on 2016-03-08. Permission was granted on 2016-10-11, 7 months later. The site became operational on 2023-12-18, 86 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5615.

Novarly Parcel · official public data, read properly · parcel.novarly.com