Renewable sites › Farburn Place - Battery Energy Storage Facility
Farburn Place - Battery Energy Storage Facility
Farburn Place - Battery Energy Storage Facility is under construction in Aberdeen City with a recorded capacity of 30 MW.
Planning and build timeline
| Application submitted | 2021-05-13 |
| Permission granted | 2021-09-30 5 months after submission |
| Operational | not recorded |
Aberdeen City’s record on battery storage
Aberdeen City has decided 7 battery storage schemes and approved 86%, taking a median of 10.2 months. See every battery storage scheme decision in Aberdeen City →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Iron Mountain Howe Moss Drive Solar Photovoltaics · Operational | 0.3 | 1.8 km |
Tarbothill Landfill Site Landfill Gas · Operational | 2.2 | 7.1 km |
Black Dog Landfill Gas · Operational | 2.2 | 8.1 km |
European Offshore Wind Deployment Centre (EOWDC) (Aberdeen Bay - Demonstration site) Wind Offshore · Operational | 96.8 | 9.5 km |
Ness Energy Project EfW Incineration · Operational | 11.1 | 10.9 km |
Hill of Fiddes Wind Onshore · Operational | 6.9 | 13 km |
Kincraig - Solar Farm and battery storage system Solar Photovoltaics · Under Construction | 21 | 14.4 km |
Kincraig - Solar Farm and battery storage system Battery · Under Construction | — | 14.4 km |
How big is Farburn Place - Battery Energy Storage Facility?
Farburn Place - Battery Energy Storage Facility has a recorded installed capacity of 30 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Farburn Place - Battery Energy Storage Facility?
REPD records the operator as Peak Reserve Power Limited / Centrica / Cragside. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Farburn Place - Battery Energy Storage Facility approved and built?
The application was submitted on 2021-05-13. Permission was granted on 2021-09-30, 5 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 8385.