Wick Farm (Burnham on Crouch) is an operational 5 MW solar farm in Maldon, generating since 17 December 2015. Planning permission was granted on 26 January 2015, 5 months after submission. Operator of record: Countryside Renewables.

5 MW
Capacity
as recorded in REPD
Operational
Status
since 17 December 2015
Solar Photovoltaics
Technology
Countryside Renewables
Maldon
Authority
England

Planning and build timeline

Application submitted9 September 2014
Permission granted26 January 2015
5 months after submission
Operational17 December 2015
11 months after consent

Screening a site of your own?

RedlineUK · £39

Maldon approves 75% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Wick Farm (Burnham on Crouch)’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Maldon’s record on solar

Maldon has decided 8 solar farms and approved 75%, taking a median of 4.4 months. See every solar farm decision in Maldon

Other built sites within 15 km

SiteMWDistance
Wind Onshore · Operational
17.53.2 km
Wind Onshore · Operational
20.75.3 km
Landfill Gas · Operational
2.46.3 km
Wind Onshore · Operational
209.3 km
Solar Photovoltaics · Operational
510.1 km
Solar Photovoltaics · Under Construction
49.9910.7 km
Battery · Under Construction
2010.7 km
Solar Photovoltaics · Operational
2.511.8 km

How big is Wick Farm (Burnham on Crouch)?

Wick Farm (Burnham on Crouch) has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Wick Farm (Burnham on Crouch)?

REPD records the operator as Countryside Renewables. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Wick Farm (Burnham on Crouch) approved and built?

The application was submitted on 9 September 2014. Permission was granted on 26 January 2015, 5 months later. The site became operational on 17 December 2015, 11 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2268.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode