Renewable sitesMaldon Wycke Solar Farm

Maldon Wycke Solar Farm

Maldon Wycke Solar Farm is operational in Maldon with a recorded capacity of 25 MW, and has been generating since 2024-10-01.

25 MW
Capacity
as recorded in REPD
Operational
Status
since 2024-10-01
Solar Photovoltaics
Technology
Low Carbon UK
Maldon
Authority
England

Planning and build timeline

Application submitted2022-02-23
Permission granted2022-08-08
5 months after submission
Operational2024-10-01
26 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Maldon’s record on solar

Maldon has decided 8 solar farms and approved 75%, taking a median of 4.4 months. See every solar farm decision in Maldon

Other built sites within 15 km

SiteMWDistance
South Fambridge Hall - Solar farm & Battery storage
Solar Photovoltaics · Under Construction
49.998.8 km
South Fambridge Hall - Solar farm & Battery storage
Battery · Under Construction
208.8 km
Fambridge Road/Canewdon Road
Solar Photovoltaics · Operational
59.7 km
Bradwell Wind Farm (Repower)
Wind Onshore · Operational
2011.1 km
Morrisons Witham - Solar Pv Panels
Solar Photovoltaics · Operational
0.1911.8 km
Wilkin And Sons, Factory Hill - Solar Farm
Solar Photovoltaics · Operational
6.1513.1 km
Highfields Farm (Braintree)
Solar Photovoltaics · Operational
2.814 km
Highfields Farm (Colchester)
Solar Photovoltaics · Operational
12.214 km

How big is Maldon Wycke Solar Farm?

Maldon Wycke Solar Farm has a recorded installed capacity of 25 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Maldon Wycke Solar Farm?

REPD records the operator as Low Carbon UK. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Maldon Wycke Solar Farm approved and built?

The application was submitted on 2022-02-23. Permission was granted on 2022-08-08, 5 months later. The site became operational on 2024-10-01, 26 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 8023.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council