Renewable sites › Barnsdale Road Solar Park
Barnsdale Road Solar Park
Barnsdale Road Solar Park is under construction in Leeds with a recorded capacity of 40 MW.
Planning and build timeline
| Application submitted | 2020-12-07 |
| Permission granted | 2021-10-21 10 months after submission |
| Operational | not recorded |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
- Green Belt — Leeds
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Leeds’s record on solar
Leeds has decided 55 solar farms and approved 98%, taking a median of 1.6 months. See every solar farm decision in Leeds →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Peckfield Quarry Landfill Scheme Landfill Gas · Operational | 3.9 | 3.2 km |
Skelton Grange Landfill Landfill Gas · Operational | 5.2 | 5.6 km |
Hook Moor Wind Onshore · Operational | 10.3 | 6.4 km |
Monk Fryston Battery Storage Battery · Under Construction | 320 | 6.4 km |
Monk Fryston Battery Storage Battery · Under Construction | 57 | 6.6 km |
Kirkhaw Lane - Battery Storage Energy Battery · Operational | 150 | 7.1 km |
Ferrybridge Multifuel 1 (FM1) EfW Incineration · Operational | 68 | 7.1 km |
Ferrybridge Multifuel 2 (FM2) EfW Incineration · Operational | 70 | 7.1 km |
How big is Barnsdale Road Solar Park?
Barnsdale Road Solar Park has a recorded installed capacity of 40 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Barnsdale Road Solar Park?
REPD records the operator as OnPath Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Barnsdale Road Solar Park approved and built?
The application was submitted on 2020-12-07. Permission was granted on 2021-10-21, 10 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 8167.