County Hall, Loansdean - Solar Array

County Hall, Loansdean - Solar Array is operational in Northumberland with a recorded capacity of 0.8 MW, and has been generating since 2023-08-18.

0.8 MW
Capacity
as recorded in REPD
Operational
Status
since 2023-08-18
Solar Photovoltaics
Technology
Northumberland County Council
Northumberland
Authority
England

Planning and build timeline

Application submitted2022-12-12
Permission granted2023-02-17
2 months after submission
Operational2023-08-18
6 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Northumberland’s record on solar

Northumberland has decided 31 solar farms and approved 100%, taking a median of 1.9 months. See every solar farm decision in Northumberland

Other built sites within 15 km

SiteMWDistance
County Hall, Loansdean - Battery Storage
Battery · Operational
0.40 km
North East Grains Site
Anaerobic Digestion · Operational
0.55.3 km
MSD Cramlington
Wind Onshore · Operational
46.8 km
Cramlington CHP
Biomass (dedicated) · Operational
27.77.4 km
Brenkley Landfill
Landfill Gas · Operational
1.99.4 km
Blyth Sewage Treatment Works
Solar Photovoltaics · Operational
2.39.4 km
Bewick Drift
Wind Onshore · Operational
2.310.5 km
Lynemouth Windfarm (Resubmission)
Wind Onshore · Operational
2610.6 km

How big is County Hall, Loansdean - Solar Array?

County Hall, Loansdean - Solar Array has a recorded installed capacity of 0.8 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates County Hall, Loansdean - Solar Array?

REPD records the operator as Northumberland County Council. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was County Hall, Loansdean - Solar Array approved and built?

The application was submitted on 2022-12-12. Permission was granted on 2023-02-17, 2 months later. The site became operational on 2023-08-18, 6 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 12934.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council