Silent Valley Landfill Scheme

Silent Valley Landfill Scheme is an operational 2.7 MW landfill gas site in Blaenau Gwent, generating since 11 March 2006. Planning permission was granted on 14 April 1994, 1 months after submission. Operator of record: NOVERA.

2.7 MW
Capacity
as recorded in REPD
Operational
Status
since 11 March 2006
Landfill Gas
Technology
NOVERA
Blaenau Gwent
Authority
Wales

Planning and build timeline

Application submitted8 March 1994
Permission granted14 April 1994
1 months after submission
Operational11 March 2006
143 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Blaenau Gwent: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Silent Valley Landfill Scheme’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
143.7 km
Solar Photovoltaics · Operational
4.15.8 km
Battery · Under Construction
66.4 km
Wind Onshore · Operational
46.8 km
Landfill Gas · Operational
77 km
Solar Photovoltaics · Operational
2.67.5 km
Wind Onshore · Operational
47.7 km
Solar Photovoltaics · Operational
59.4 km

How big is Silent Valley Landfill Scheme?

Silent Valley Landfill Scheme has a recorded installed capacity of 2.7 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Silent Valley Landfill Scheme?

REPD records the operator as NOVERA. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Silent Valley Landfill Scheme approved and built?

The application was submitted on 8 March 1994. Permission was granted on 14 April 1994, 1 months later. The site became operational on 11 March 2006, 143 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 601.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode