Land At Cwm Bargoed

Land At Cwm Bargoed is operational in Caerphilly with a recorded capacity of 5 MW, and has been generating since 2016-01-20.

5 MW
Capacity
as recorded in REPD
Operational
Status
since 2016-01-20
Solar Photovoltaics
Technology
Kronos Solar/ Vogt Solar
Caerphilly
Authority
Wales

Planning and build timeline

Application submitted2015-06-01
Permission granted2015-09-17
4 months after submission
Operational2016-01-20
4 months after consent

Caerphilly’s record on solar

Caerphilly has decided 7 solar farms and approved 100%, taking a median of 3.5 months. See every solar farm decision in Caerphilly

Other built sites within 15 km

SiteMWDistance
Trecatti
Landfill Gas · Operational
72.5 km
Pen Bryn Oer Wind Farm
Wind Onshore · Operational
44.3 km
Bryn Pica AD / Tomorrow's Valley (Waste AD) - resubmission
Anaerobic Digestion · Operational
18.3 km
Hendai Farm
Solar Photovoltaics · Operational
13.48.5 km
Rassau Industrial Estate
Battery · Under Construction
68.6 km
Pen Rhiw Caradog
Solar Photovoltaics · Operational
4.79.3 km
Silent Valley Landfill Scheme
Landfill Gas · Operational
2.79.4 km
Gelliargwellt Uchaf Farm AD
Anaerobic Digestion · Operational
1.49.7 km

How big is Land At Cwm Bargoed?

Land At Cwm Bargoed has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Land At Cwm Bargoed?

REPD records the operator as Kronos Solar/ Vogt Solar. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Land At Cwm Bargoed approved and built?

The application was submitted on 2015-06-01. Permission was granted on 2015-09-17, 4 months later. The site became operational on 2016-01-20, 4 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5292.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council