Hafod-Y-Dafal Farm is operational in Blaenau Gwent with a recorded capacity of 14 MW, and has been generating since 2015-12-22.

14 MW
Capacity
as recorded in REPD
Operational
Status
since 2015-12-22
Solar Photovoltaics
Technology
KS SPV53 Ltd
Blaenau Gwent
Authority
Wales

Planning and build timeline

Application submitted2014-05-16
Permission granted2014-11-07
6 months after submission
Operational2015-12-22
13 months after consent

Other built sites within 15 km

SiteMWDistance
Manmoel Road Solar Park
Solar Photovoltaics · Operational
4.12.9 km
Silent Valley Landfill Scheme
Landfill Gas · Operational
2.73.7 km
Oakdale Business Park
Wind Onshore · Operational
44.4 km
Land at Darran Farm
Solar Photovoltaics · Operational
2.64.4 km
Upper Pant-Ysgawen Farm/Crumlin
Solar Photovoltaics · Operational
4.96 km
Trecatti
Landfill Gas · Operational
78.7 km
Pen Bryn Oer Wind Farm
Wind Onshore · Operational
49.8 km
Hendai Farm
Solar Photovoltaics · Operational
13.410 km

How big is Hafod-Y-Dafal Farm?

Hafod-Y-Dafal Farm has a recorded installed capacity of 14 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Hafod-Y-Dafal Farm?

REPD records the operator as KS SPV53 Ltd. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Hafod-Y-Dafal Farm approved and built?

The application was submitted on 2014-05-16. Permission was granted on 2014-11-07, 6 months later. The site became operational on 2015-12-22, 13 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2176.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council