Novarly ParcelRenewable sites

Renewable sitesRassau Industrial Estate

Rassau Industrial Estate

Rassau Industrial Estate is a 6 MW battery storage site under construction in Blaenau Gwent. Planning permission was granted on 22 January 2020, 2 months after submission. Operator of record: Private Developer.

6 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Battery
Technology
Private Developer
Blaenau Gwent
Authority
Wales

Planning and build timeline

Application submitted25 November 2019
Permission granted22 January 2020
2 months after submission
Operationalnot recorded

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Blaenau Gwent: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Rassau Industrial Estate’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented battery storage scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Other built sites within 15 km

SiteMWDistance
Wind Onshore · Operational
44.3 km
Landfill Gas · Operational
2.76.4 km
Landfill Gas · Operational
77.5 km
Solar Photovoltaics · Operational
58.6 km
Solar Photovoltaics · Operational
1410.1 km
Solar Photovoltaics · Operational
4.111.7 km
Solar Photovoltaics · Operational
2.613.3 km
Wind Onshore · Operational
413.6 km

How big is Rassau Industrial Estate?

Rassau Industrial Estate has a recorded installed capacity of 6 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Rassau Industrial Estate?

REPD records the operator as Private Developer. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Rassau Industrial Estate approved and built?

The application was submitted on 25 November 2019. Permission was granted on 22 January 2020, 2 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 7841.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode