Holbrook Community Renewable Energy Centre

Holbrook Community Renewable Energy Centre is operational in Sheffield with a recorded capacity of 6.5 MW, and has been generating since 2017-04-24.

6.5 MW
Capacity
as recorded in REPD
Operational
Status
since 2017-04-24
Biomass (dedicated)
Technology
UYE (UK) / Veolia
Sheffield
Authority
England

Planning and build timeline

Application submitted2012-03-29
Permission granted2012-09-25
6 months after submission
Operational2017-04-24
55 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
The Breck
Solar Photovoltaics · Operational
55.9 km
Penny Hill Lane
Wind Onshore · Operational
19.86.3 km
Staveley Power
Landfill Gas · Operational
2.16.6 km
Loscar Farm
Wind Onshore · Operational
4.56.7 km
Advanced Manufacturing Research Centre
Wind Onshore · Operational
2.67 km
Land at Oxcroft Stocking Ground
Solar Photovoltaics · Operational
47.7 km
Inkersall Road, Staveley - Solar Photovoltaic Farm And Battery Storage
Solar Photovoltaics · Operational
318.1 km
Inkersall Road, Staveley - Solar Photovoltaic Farm And Battery Storage
Battery · Operational
8.1 km

How big is Holbrook Community Renewable Energy Centre?

Holbrook Community Renewable Energy Centre has a recorded installed capacity of 6.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Holbrook Community Renewable Energy Centre?

REPD records the operator as UYE (UK) / Veolia. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Holbrook Community Renewable Energy Centre approved and built?

The application was submitted on 2012-03-29. Permission was granted on 2012-09-25, 6 months later. The site became operational on 2017-04-24, 55 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 117.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council