Holbrook Community Renewable Energy Centre is an operational 6.5 MW biomass plant in Sheffield, generating since 24 April 2017. Planning permission was granted on 25 September 2012, 6 months after submission. Operator of record: UYE (UK) / Veolia.
Planning and build timeline
| Application submitted | 29 March 2012 |
| Permission granted | 25 September 2012 6 months after submission |
| Operational | 24 April 2017 55 months after consent |
Screening a site of your own?
Redline runs the record on your own boundary in Sheffield: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Holbrook Community Renewable Energy Centre’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Urban agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Solar Photovoltaics · Operational | 5 | 5.9 km |
Wind Onshore · Operational | 19.8 | 6.3 km |
Landfill Gas · Operational | 2.1 | 6.6 km |
Wind Onshore · Operational | 4.5 | 6.7 km |
Wind Onshore · Operational | 2.6 | 7 km |
Solar Photovoltaics · Operational | 4 | 7.7 km |
Solar Photovoltaics · Operational | 31 | 8.1 km |
Battery · Operational | — | 8.1 km |
How big is Holbrook Community Renewable Energy Centre?
Holbrook Community Renewable Energy Centre has a recorded installed capacity of 6.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Holbrook Community Renewable Energy Centre?
REPD records the operator as UYE (UK) / Veolia. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Holbrook Community Renewable Energy Centre approved and built?
The application was submitted on 29 March 2012. Permission was granted on 25 September 2012, 6 months later. The site became operational on 24 April 2017, 55 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 117.