Renewable sitesDolphin Square - Solar panels

Dolphin Square - Solar panels

Dolphin Square - Solar panels is a solar farm under construction in Westminster. Planning permission was granted on 5 December 2022, 7 months after submission. Operator of record: The Dolphin Square Estate S.a.r.l.

Capacity
as recorded in REPD
Under Construction
Status
no operational date
Solar Photovoltaics
Technology
The Dolphin Square Estate S.a.r.l
Westminster
Authority
England

Planning and build timeline

Application submitted26 April 2022
Permission granted5 December 2022
7 months after submission
Operationalnot recorded

Screening a site of your own?

RedlineUK · £39

Westminster approves 83% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Dolphin Square - Solar panels’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Westminster’s record on solar

Westminster has decided 6 solar farms and approved 83%, taking a median of 1.5 months. See every solar farm decision in Westminster

Other built sites within 15 km

SiteMWDistance
EfW Incineration · Operational
356.3 km
Solar Photovoltaics · Operational
0.167.7 km
Solar Photovoltaics · Operational
19.8 km
Biomass (dedicated) · Operational
310.6 km
Solar Photovoltaics · Operational
111.4 km
EfW Incineration · Operational
2611.8 km
Solar Photovoltaics · Under Construction
0.2412.4 km
Solar Photovoltaics · Under Construction
0.4313.6 km

How big is Dolphin Square - Solar panels?

REPD does not record an installed capacity for Dolphin Square - Solar panels.

Who operates Dolphin Square - Solar panels?

REPD records the operator as The Dolphin Square Estate S.a.r.l. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Dolphin Square - Solar panels approved and built?

The application was submitted on 26 April 2022. Permission was granted on 5 December 2022, 7 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 11293.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode