Renewable sites › Dolphin Square - Solar panels
Dolphin Square - Solar panels
Dolphin Square - Solar panels is under construction in Westminster.
Planning and build timeline
| Application submitted | 2022-04-26 |
| Permission granted | 2022-12-05 7 months after submission |
| Operational | not recorded |
What this site sits on
The recorded coordinate falls on land surveyed as Urban agricultural land.
- Conservation area — Dolphin Square
- Registered park or garden — Dolphin Square Gardens
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Westminster’s record on solar
Westminster has decided 6 solar farms and approved 83%, taking a median of 1.5 months. See every solar farm decision in Westminster →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
SELCHP ERF EfW Incineration · Operational | 35 | 6.3 km |
Holly Street - Solar PV Panels Solar Photovoltaics · Operational | 0.16 | 7.7 km |
Bywaters� Materials Recovery Facility Solar Array Solar Photovoltaics · Operational | 1 | 9.8 km |
King's Yard Biomass (dedicated) · Operational | 3 | 10.6 km |
Thameside DC Solar Photovoltaics · Operational | 1 | 11.4 km |
Beddington EfW EfW Incineration · Operational | 26 | 11.8 km |
Leyes Road - New SEN School Solar Photovoltaics · Under Construction | 0.24 | 12.4 km |
Ham Close - 452 Houses, Flats & Leisure Centre Solar Photovoltaics · Under Construction | 0.43 | 13.6 km |
How big is Dolphin Square - Solar panels?
REPD does not record an installed capacity for Dolphin Square - Solar panels.
Who operates Dolphin Square - Solar panels?
REPD records the operator as The Dolphin Square Estate S.a.r.l. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Dolphin Square - Solar panels approved and built?
The application was submitted on 2022-04-26. Permission was granted on 2022-12-05, 7 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 11293.