Renewable sites › SAS International, Unit 1 - Solar PV Panels
SAS International, Unit 1 - Solar PV Panels
SAS International, Unit 1 - Solar PV Panels is a 0.8 MW solar farm under construction in Bridgend. Planning permission was granted on 25 October 2021, 2 months after submission. Operator of record: SAS International Limited.
Planning and build timeline
| Application submitted | 20 August 2021 |
| Permission granted | 25 October 2021 2 months after submission |
| Operational | not recorded |
Screening a site of your own?
Bridgend approves 100% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with SAS International, Unit 1 - Solar PV Panels’s recorded coordinate — swap in your own postcode or coordinates.
Bridgend’s record on solar
Bridgend has decided 6 solar farms and approved 100%, taking a median of 3.5 months. See every solar farm decision in Bridgend →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Solar Photovoltaics · Operational | 2.2 | 1 km |
Solar Photovoltaics · Operational | 3.4 | 1.6 km |
Solar Photovoltaics · Operational | 15 | 6.9 km |
Solar Photovoltaics · Under Construction | 1.3 | 7.4 km |
Solar Photovoltaics · Operational | 4 | 8 km |
Solar Photovoltaics · Operational | 2 | 8.4 km |
Wind Onshore · Operational | 9.4 | 8.5 km |
Landfill Gas · Operational | 1.2 | 8.7 km |
How big is SAS International, Unit 1 - Solar PV Panels?
SAS International, Unit 1 - Solar PV Panels has a recorded installed capacity of 0.8 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates SAS International, Unit 1 - Solar PV Panels?
REPD records the operator as SAS International Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was SAS International, Unit 1 - Solar PV Panels approved and built?
The application was submitted on 20 August 2021. Permission was granted on 25 October 2021, 2 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 9541.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode