Renewable sites › SAS International, Unit 1 - Solar PV Panels
SAS International, Unit 1 - Solar PV Panels
SAS International, Unit 1 - Solar PV Panels is under construction in Bridgend with a recorded capacity of 0.8 MW.
Planning and build timeline
| Application submitted | 2021-08-20 |
| Permission granted | 2021-10-25 2 months after submission |
| Operational | not recorded |
Bridgend’s record on solar
Bridgend has decided 6 solar farms and approved 100%, taking a median of 3.5 months. See every solar farm decision in Bridgend →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Land At Court Farm Solar Photovoltaics · Operational | 2.2 | 1 km |
Corntown Farm Solar Photovoltaics · Operational | 3.4 | 1.6 km |
Court Colman solar park Solar Photovoltaics · Operational | 15 | 6.9 km |
Whitehall Farm, Llanharry Road - Solar PV Panels Solar Photovoltaics · Under Construction | 1.3 | 7.4 km |
Agricultural Land at Trecastle Solar Photovoltaics · Operational | 4 | 8 km |
Morfa Farm Solar Photovoltaics · Operational | 2 | 8.4 km |
Mynydd Portref Wind Onshore · Operational | 9.4 | 8.5 km |
Tythegston Landfill Site Landfill Gas · Operational | 1.2 | 8.7 km |
How big is SAS International, Unit 1 - Solar PV Panels?
SAS International, Unit 1 - Solar PV Panels has a recorded installed capacity of 0.8 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates SAS International, Unit 1 - Solar PV Panels?
REPD records the operator as SAS International Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was SAS International, Unit 1 - Solar PV Panels approved and built?
The application was submitted on 2021-08-20. Permission was granted on 2021-10-25, 2 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 9541.