Novarly ParcelRenewable planning

Renewable planning SolarBridgend

Solar planning in Bridgend

Bridgend has decided 6 solar farms and approved 100% of them, taking a median of 3.5 months to decide. Consented capacity: 27 MW. 3 applications still awaiting a decision.

100%
Approved
6 granted · 0 refused
3.5 mo
Median decision
UK 2.3 mo
27 MW
Consented
across approved schemes
1
Appeals
1 allowed on appeal

⚠️ Small caseload (6 decided). Percentages here move a lot with one more decision — read them as indicative, not as a reliable rate.

How Bridgend compares

Against the 298 UK authorities with 5+ solar decisions, Bridgend sits in the 77th percentile for approval rate (7 points above the England average) and the 22nd percentile for speed.

Decisions by year

35Approved — 2 (2014)214Approved — 1 (2015)115Approved — 1 (2016)116Approved — 1 (2017)117Approved — 1 (2021)121
Approved Refused

Solar decisions by the year the decision was issued (Renewable Energy Planning Database). Withdrawn and still-undecided applications are excluded, so a short bar can mean a quiet year rather than a strict council.

Every recorded scheme (10)

SchemeMWStatusDecided
Princess Of Wales Hospital, Coity Road - Solar Panels
Veolia UK Limited · P/26/113/FUL
0.95Application Submitted2026-03-18
Princess Of Wales Hospital, Coity Road - Solar Panels
Veolia · P/26/105/FUL
0.65Application Submitted2026-03-10
Hendir Uchaf Farm, Minffrwd Road - Solar Array
Shillibier Limited · P/25/717/FUL
1.5Application Submitted2025-12-18
SAS International, Unit 1 - Solar PV Panels
SAS International Limited · P/21/765/FUL · 2.2 mo to decide
0.8Under Construction2021-10-25
Court Colman
Solar Energy Farm · P/17/423/FUL · 3.5 mo to decide
1Planning Permission Expired2017-08-31
Foel Fawr
Marcol Afan Energy · P/14/543/FUL · 20.2 mo to decide
5.1Planning Permission Expired2016-04-22
Stormy Down Solar Farm
Belisama Energy · P/15/312/FUL · 3.5 mo to decide
3.8Operational2015-08-27
Court Colman solar park
Suncredit UK/ Vogt Solar · P/14/337/FUL · 7.4 mo to decide
15Operational2014-12-24
Seaview Farm
Private Developer · P/14/148/FUL · 3.2 mo to decide
1.7Operational2014-06-11
Cwm Nant Gwyn
Solar IQ · P/12/887/FUL · 1.8 mo to decide
2.5Abandoned2013-02-13

Does Bridgend approve solar farms?

Yes — of the 6 solar farms Bridgend has decided, 100% were approved (6 granted, 0 refused). The UK-wide rate for solar is 93%. Note this is a small caseload, so treat the percentage as indicative rather than statistically robust.

How long does a solar farm application take in Bridgend?

The median time from application to decision is 3.5 months, against a UK median of 2.3 months for solar. That is measured between the submission and decision dates recorded in REPD, so it reflects the whole determination period including any extensions.

How much solar capacity has Bridgend consented?

27 MW has been consented across 6 approved schemes. A further 3 applications awaits a decision.

Other technologies in Bridgend

Battery storage in BridgendOnshore wind in Bridgend

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0 — 2026 Q1 extract. Approval rate is over decided applications only (approved ÷ approved+refused); withdrawn and undecided schemes are excluded. A permission later expired still counts as approved because consent was granted. REPD covers schemes of roughly 150 kW and above, is published quarterly, and does not record refusal reasons — so nothing here explains why a scheme was refused. Screening context for site selection, not planning advice.

Novarly Parcel · official public data, read properly · parcel.novarly.com