Renewable sitesAgricultural Land at Trecastle

Agricultural Land at Trecastle

Agricultural Land at Trecastle is operational in Rhondda Cynon Taf with a recorded capacity of 4 MW, and has been generating since 2015-12-15.

4 MW
Capacity
as recorded in REPD
Operational
Status
since 2015-12-15
Solar Photovoltaics
Technology
Suncredit UK/ Vogt solar
Rhondda Cynon Taf
Authority
Wales

Planning and build timeline

Application submitted2015-03-26
Permission granted2015-10-15
7 months after submission
Operational2015-12-15
2 months after consent

Rhondda Cynon Taf’s record on solar

Rhondda Cynon Taf has decided 13 solar farms and approved 100%, taking a median of 5 months. See every solar farm decision in Rhondda Cynon Taf

Other built sites within 15 km

SiteMWDistance
Whitehall Farm, Llanharry Road - Solar PV Panels
Solar Photovoltaics · Under Construction
1.30.8 km
Graig Fatha Farm
Wind Onshore · Operational
2.53.9 km
Energy Centre Royal Mint
Battery · Operational
204.2 km
Mynydd Portref
Wind Onshore · Operational
9.44.3 km
Mynydd Portref Wind Farm extension
Wind Onshore · Operational
124.4 km
West of Rhiwfelin Fach Farm
Wind Onshore · Operational
1.54.6 km
Coed Ely - Solar Farm
Solar Photovoltaics · Under Construction
64.8 km
Taff Ely Wind Farm
Wind Onshore · Operational
95.8 km

How big is Agricultural Land at Trecastle?

Agricultural Land at Trecastle has a recorded installed capacity of 4 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Agricultural Land at Trecastle?

REPD records the operator as Suncredit UK/ Vogt solar. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Agricultural Land at Trecastle approved and built?

The application was submitted on 2015-03-26. Permission was granted on 2015-10-15, 7 months later. The site became operational on 2015-12-15, 2 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5150.