Corntown Farm is an operational 3.4 MW solar farm in Vale of Glamorgan, generating since 15 March 2017. Planning permission was granted on 20 November 2015, 4 months after submission. Operator of record: SBC Renewables.

3.4 MW
Capacity
as recorded in REPD
Operational
Status
since 15 March 2017
Solar Photovoltaics
Technology
SBC Renewables
Vale of Glamorgan
Authority
Wales

Planning and build timeline

Application submitted22 July 2015
Permission granted20 November 2015
4 months after submission
Operational15 March 2017
16 months after consent

Screening a site of your own?

RedlineUK · £39

Vale of Glamorgan approves 96% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Corntown Farm’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Vale of Glamorgan’s record on solar

Vale of Glamorgan has decided 25 solar farms and approved 96%, taking a median of 4.2 months. See every solar farm decision in Vale of Glamorgan

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Under Construction
0.81.6 km
Solar Photovoltaics · Operational
2.22.2 km
Solar Photovoltaics · Operational
26.8 km
Solar Photovoltaics · Operational
157.8 km
Solar Photovoltaics · Under Construction
1.38.2 km
Solar Photovoltaics · Operational
48.8 km
Landfill Gas · Operational
1.29 km
Wind Onshore · Operational
9.49.9 km

How big is Corntown Farm?

Corntown Farm has a recorded installed capacity of 3.4 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Corntown Farm?

REPD records the operator as SBC Renewables. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Corntown Farm approved and built?

The application was submitted on 22 July 2015. Permission was granted on 20 November 2015, 4 months later. The site became operational on 15 March 2017, 16 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5548.